๐Ÿ›ข๏ธ Sofia 21-28-33 1H

Rockport Energy Solutions, LLC ยท McKenzie County, ND ยท File #42036 ยท Generated 2026-08-22 00:31

API
33-053-10615
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Production liner to be cemented in lateral with wet shoe system for ability to frac out shoe
๐Ÿ“„ APD Stipulations section and Drilling Prognosis schematic
Non-standard cementing approach for lateral liner indicates planned contingency for shoe isolation during completion
Relative Completions / Frac
Tier 3 MWD failure at 18,993' MD on July 12, 2025 requiring BHA change and 14-hour downtimeโฐ TIME-SENSITIVE
๐Ÿ“„ Sample Descriptions section
Unplanned equipment failure during lateral drilling caused operational delay and additional trip
2025-07-12 General Oilfield Services
Tier 3 Well drilled with Patterson 563 rig despite APD stating expected contract with Nabors B27 rig
๐Ÿ“„ Well Summary section and APD Proposed Work section
Operator changed rig contractors between permit submission (March 2025) and actual spud (June 2025), indicating potential rig availability issues or last-minute contracting decisions
2025-06-30 Drilling Rigs
Tier 3 Operator required to run porosity and resistivity logs from KOP to base of surface casing per permit stipulation
๐Ÿ“„ APD Stipulations section
Regulatory requirement beyond standard logging indicates specific formation evaluation needs or past compliance issues
Relative General Oilfield Services
Tier 3 Four-well pad includes SWD disposal well (Sofia 16 No. 1 SWD) on same location
๐Ÿ“„ Geological Summary and Multi-well Plan sections
Integrated pad design with disposal infrastructure indicates long-term operational planning and water management strategy
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Completion and Stimulation Services
Well is 'Awaiting Completion' as of July 2025; wet shoe system and planned plug-and-perf completion indicate imminent frac operations
Flowback and Production Testing
Completion will be followed by flowback through test equipment and central tank battery; services needed within weeks
Coiled Tubing or Workover Services
Frac plug drill-out required after stimulation using jointed pipe or coiled tubing
Water Management and Disposal
Integrated SWD well on pad indicates need for produced water handling; pad-scale water infrastructure required
Wellhead and Pressure Control Equipment
All wellhead equipment specified as 15K; need for installation and testing prior to completion