| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 | Well awaiting completion to maximize production potential post-TD.⏱ URGENT 6.0 Well Summary |
2025-10-13 | Completions / Frac |
| Tier 3 | Elevated gas readings in sidetrack lateral compared to original wellbore, with average 613 units and peak 3103 units. 5.2 Sidetrack 01 Wellbore Lateral Gas evaluation |
2025-10-13 | Drilling Rigs |
| Tier 3 | Sidetrack operation initiated to drill into adjacent spacing unit for enhanced reservoir access.⏱ URGENT Table 5: Notable Operations - 10/8/2025 |
2025-10-08 | General Oilfield Services |
| Tier 3 | Drill-back offset notification to adjacent spacing unit operator for wellbore integrity. RE: Drill-Back Offset Operator Notification - June 16, 2025 |
2025-06-16 | Directional Drilling |