| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 1 |
Waiver obtained for tubing/packer requirement with safety assurances ๐ Request for Consideration/Waiver, page 257130 Variance from standard casing requirements, citing safety factors |
2025-07-07 | Regulatory / Permitting |
| Tier 3 |
Placement of 10,000 bbl Poseidon freshwater tank on padโฐ TIME-SENSITIVE ๐ Sundry Information, page 1 Extended freshwater storage for future operations, beyond standard drilling needs |
2025-12-29 | Completions / Frac |
| Tier 3 |
Motor failure during lateral drilling, requiring trip out and resumptionโฐ TIME-SENSITIVE ๐ Geological Summary, page 5 Equipment failure in lateral section, non-standard for typical operations |
2025-11-01 | Mud / Fluids |
| Tier 3 |
Sidetrack initiated due to communication with another wellbore during curve landingโฐ TIME-SENSITIVE ๐ Geological Summary, page 4 Indicates operational complication requiring immediate remediation, potentially exposing opportunities for directional drilling and cementing services |
2025-10-23 | Directional Drilling |
| Tier 3 |
Request to revise casing design to larger surface casing ๐ Request for Consideration/Waiver, page 271973 Modification from standard 9 5/8" to 13 3/8" casing, approved pre-spud |
2025-09-25 | General Oilfield Services |
| Tier 3 |
Waiver obtained for filter sock container requirement ๐ Request for Consideration/Waiver, page 257122 Regulatory exemption for filtration system, reducing operational costs |
2025-07-07 | Regulatory / Permitting |
| Tier 3 |
Waiver obtained for open hole logs, relying on offset well data ๐ Request for Consideration/Waiver, page 257103 Avoidance of logging costs by referencing nearby well |
2025-07-07 | Regulatory / Permitting |