โ† Back to Daily Permits

๐Ÿ›ข๏ธ Big Stone 32-29-20 4H

Phoenix Operating, LLC ยท Williams County County, ND ยท File #42090 ยท Generated 2026-02-10 19:19

API
33-105-06628
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Waiver approved for tubing/packer requirement, with assurances on casing integrity and monitoring for flowback.
๐Ÿ“„ Sundry Form 257134
Allows deferral of production equipment installation until after flowback, optimizing capital timing.
2025-07-07 Regulatory / Permitting
Tier 2 Wet shoe design with frac-out capability for toe section.
๐Ÿ“„ Wellbore Schematic
Enables frac operations without dedicated toe prep, simplifying completion.
Unknown Completions / Frac
Tier 3 Lateral drilled in one run with Reed RH54-A1 bit and Baker mud motor, steered via Starsteer software.
๐Ÿ“„ Geological Summary
Single-run lateral completion suggests efficient BHA and steering technology.
2025-11-25 Directional Drilling
Tier 3 Formation tops deviated from prognosis: Base of Last Salt 1' high, Mission Canyon 3' low, Lodgepole 3' low.
๐Ÿ“„ Geological Summary and Formation Tops table
Adjustments to landing target from 9,436' to 9,430' TVD indicate real-time geological steering.
2025-11-22 General Oilfield Services
Tier 3 Waiver approved for filter sock container exemption, citing no filtration use during drilling phase.
๐Ÿ“„ Sundry Form 257127
Reduces regulatory compliance costs by avoiding container maintenance on site.
2025-07-10 Regulatory / Permitting
Tier 3 Waiver approved for open hole logs, relying on offset well data within 1 mile.
๐Ÿ“„ Sundry Form 257109
Avoids redundant logging, citing proximity to existing logged well.
2025-07-07 Regulatory / Permitting
Tier 3 Waiver approved for drill cutting samples in vertical section, collecting from adjacent well instead.
๐Ÿ“„ Sundry Form 257116
Shares sampling burden across pad wells, reducing per-well costs.
2025-07-07 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Completion and Flowback Services
Well TD on 2025-11-28, waiting for completion; tubing waiver defers production equipment, creating immediate opportunity.
Directional Drilling and Geological Consulting
Drilling completed in 7.85 days with active steering; pad has four more wells, indicating ongoing demand.
Regulatory and Surveying Services
Multiple waivers approved pre-spud; surveying and plats completed, but future pads may require similar support.