| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver approved for tubing/packer requirement, using safety factors and monitoring assurances ๐ SUNDRY FORM FOR WELL FILE NO.: 42091 FORM ID: 257135 Relies on casing integrity and monitoring instead of packer, deviating from standard NDAC rules |
2025-07-07 | Regulatory / Permitting |
| Tier 3 |
Well drilled 100% in zone in Middle Bakken, 10.63 days from spud ๐ Geological Summary Achieved full zone coverage in single lateral run, efficient execution |
2025-11-19 | General Oilfield Services |
| Tier 3 |
Use of Reed RH54-A3 6โ drill bit and Baker mud motor in lateral drillingโฐ TIME-SENSITIVE ๐ Geological Summary - Horizontal Wellbore section Specific vendor tools selected for lateral run, indicating preference for performance in Middle Bakken |
2025-11-16 | Mud / Fluids |
| Tier 3 |
Starsteer software used for well steering with 8-foot target window in Middle Bakkenโฐ TIME-SENSITIVE ๐ Geological Summary - Horizontal Wellbore section Precise targeting in C and D facies, non-standard window size |
2025-11-16 | General Oilfield Services |
| Tier 3 |
Waiver granted for filter sock container, exempting requirement during drilling phase ๐ SUNDRY FORM FOR WELL FILE NO.: 42091 FORM ID: 257128 Operator does not use filtration systems, reducing on-site equipment needs |
2025-07-10 | Regulatory / Permitting |
| Tier 3 |
Waiver for open hole logs, relying on offset well data within 1 mile ๐ SUNDRY FORM FOR WELL FILE NO.: 42091 FORM ID: 257110 Avoids additional logging by referencing nearby well, reducing regulatory burden |
2025-07-07 | Regulatory / Permitting |
| Tier 3 |
Waiver for collection of drill cutting samples in vertical portion, using samples from offset well ๐ SUNDRY FORM FOR WELL FILE NO.: 42091 FORM ID: 257119 Shares samples with adjacent well on pad, reducing redundant sampling |
2025-07-07 | Regulatory / Permitting |
| Tier 3 |
Backbuild order waiver submitted, as operator controls adjacent spacing unit ๐ Letter dated June 26, 2025 from Phoenix Operating to NDIC Self-notification due to operator's ownership, bypassing external coordination |
2025-06-26 | Regulatory / Permitting |
| Tier 3 |
Wet shoe sub with ability to frac out the toe, used in completion design ๐ Wellbore schematic and Geological Summary Enables toe fracturing without packer, unique to this design |
Relative | Completions / Frac |