โ† Back to Daily Permits

๐Ÿ›ข๏ธ Toonie 5001 11-18 3B

Whiting Oil & Gas Corporation ยท McKenzie County, ND ยท File #42150 ยท Generated 2026-04-08 03:31

API
3305310641
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (9)

Tier Signal Date Service Impact
Tier 2 Wet shoe liner configuration with intentional over-displacement for toe initiation
๐Ÿ“„ WELL DETAILS
Cost-effective method for stage 1 perforating without tubing or tractor.
Unknown Completions / Frac
Tier 3 Second TOOH at 24,405' MD to change out agitator and BHA
๐Ÿ“„ SAMPLE DESCRIPTIONS
Mid-lateral equipment change, indicating operational adjustments for deeper drilling.
2025-11-03 General Oilfield Services
Tier 3 Incident: Trip out of hole (TOOH) at 15,796' MD due to loss of MWD communication; shock sub parted, fished successfully on first attempt
๐Ÿ“„ SAMPLE DESCRIPTIONS
MWD tool failure requiring fishing, but quick resolution suggests robust contingency planning.
2025-11-01 Directional Drilling
Tier 3 Waiver requested for open hole logs, justified by offset well Link 12-1H within 1 mileโฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM
Approved waiver saves on logging costs by relying on offset data.
2025-07-23 Regulatory / Permitting
Tier 3 Drill-back notification sent to adjacent operator (Kraken Operating) for wells entering Bakken Petroleum System outside target spacing unitโฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Proactive compliance with NDIC Order No. 31848, indicating intent to drill across units.
2025-07-16 General Oilfield Services
Tier 3 Anti-collision: Gamma ray signatures used to identify offset well paths, surveys increased to every 93'-100' near crossings
๐Ÿ“„ ANTI-COLLISION STATEMENT
Enhanced anti-collision measures beyond standard, using geological markers.
Unknown Directional Drilling
Tier 3 Use of remote wellsite geologist (Austin Wiitanen) alongside on-site team (Alan Chappell & Ian Shaw from Core Geologic, LLC.)
๐Ÿ“„ Well Summary
Indicates adoption of remote monitoring technology for geological steering, reducing on-site personnel needs.
Unknown General Oilfield Services
Tier 3 Mud type switch: OBM for vertical section, Saltwater/Brine for lateral section to TD
๐Ÿ“„ Well Summary
Non-standard mud choice for lateral, potentially to optimize drilling in Middle Bakken facies.
Relative Mud / Fluids
Tier 3 No use of diesel-based stimulation fluids; commitment to non-diesel compounds
๐Ÿ“„ DIESEL BASED STIMULATION FLUIDS/COMPOUNDS
Regulatory compliance and environmental preference for alternatives.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and MWD services
MWD failure on Nov 1, 2025, signals potential for tool upgrades or alternative providers post-incident.
Mud and chemical supply
Switch to brine mud in lateral starting Oct 31, 2025, indicates ongoing demand for specialized fluids.
Completion and perforating
Wet shoe setup implies wireline perforating preference; TD on Nov 7, 2025, suggests imminent completion ops.