โ† Back to Daily Permits

๐Ÿ›ข๏ธ Toonie 5001 11-18 4B

Whiting Oil & Gas Corp. ยท McKenzie County, ND ยท File #42151 ยท Generated 2026-04-09 01:38

API
3305310642
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Use of 'wet shoe' liner configuration with intentional over-displacement to create uncemented annulus for wireline perforating
๐Ÿ“„ FULL WELL DETAILS - Discussion
Non-traditional liner cementing to enable cost-effective toe initiation without tubing or tractor
Relative Completions / Frac
Tier 3 Well spudded on a five-well pad, initial pad development
๐Ÿ“„ Geological Summary
Part of a multi-well development strategy, not a standalone well
2025-09-23 General Oilfield Services
Tier 3 Request for waiver of open hole logs, justified by offset well LINK 12-1H within one mile, with GR-CBL to be run from TD to ground level
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Open Hole Log Waiver
Non-standard logging approach relying on offset data instead of full open hole suite, potentially reducing costs and time
2025-07-23 Regulatory / Permitting
Tier 3 Mud system transition from 70/30 Invert for vertical/curve to Brine for lateral section
๐Ÿ“„ MUD PROGRAM
Dual mud system to optimize drilling in different sections, not standard single system
Relative Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling Services
Kick-off and curve completion on October 9, 2025, with TD on October 29, 2025, indicating active horizontal drilling phase requiring MWD and directional expertise
Mud and Fluid Services
Mud system transition during drilling, with spud in September 2025, signaling need for specialized mud engineering through completion
Completion Services
Well awaiting completion post-TD on October 29, 2025, with wet shoe setup for wireline perforating, creating urgency for frac and completion teams