โ† Back to Daily Permits

๐Ÿ›ข๏ธ TRANS AM 3-2-1 2H

DEVON ENERGY WILLISTON, L.L.C ยท Williams County, ND ยท File #42155 ยท Generated 2026-05-08 01:51

API
3310506644
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 1 Tubing/Packer Waiver with assurances on casing integrity, safety factors, and monitoring
๐Ÿ“„ WELL SUNDRY FORM - Tubing/Packer Waiver
Variance from standard requirements based on design specifics, reducing equipment needs
2025-08-04 Regulatory / Permitting
Tier 3 Request for open hole log waiver using offsetting well Wing 4-33 1H for formation tops, with GR-CBL from TD to ground level
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver
Waiver reduces logging requirements, potentially saving costs and time by relying on nearby well data
2026-02-06 Regulatory / Permitting
Tier 3 SOD Extension due to drilling schedule changes prioritizing Drovdal 5 and Barbara 9 pad, anticipating drilling out in May 2026โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - SOD Extension
Extension beyond initial 90-day suspension highlights operational delays and reprioritization
2026-02-02 Drilling Rigs
Tier 3 Well spud notification using Noble #1 rig
๐Ÿ“„ WELL SUNDRY FORM - Notification of Work Performed
Confirms start of operations with specific rig
2025-11-02 Drilling Rigs
Tier 3 Suspension of Drilling for up to 90 days using smaller rig, with intent to move larger rig within timeframeโฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Suspension of Drilling
Phased drilling approach to optimize rig usage and costs
2025-08-04 Drilling Rigs
Tier 3 Filter Sock Container Waiver as operator does not use filter media
๐Ÿ“„ WELL SUNDRY FORM - Filter Sock Container Waiver
Exemption from standard waste handling requirements
2025-08-04 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rigs
Noble engaged for initial spud in November 2025; Nabors scheduled for May 2026 continuation; signals immediate and future rig demand
Waste Disposal
WISCO landfill contracted for drill cuttings; opportunity for service providers during active drilling phases
Regulatory Consulting
Multiple waivers approved in August 2025; indicates need for expertise in navigating NDIC processes ahead of operations