| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Tubing/Packer Waiver granted with assurances on casing integrity and monitoring during completion ๐ Tubing/Packer Waiver Sundry Form Deviation from standard tubing requirements, based on specific design assurances |
2025-08-04 | Regulatory / Permitting |
| Tier 3 |
Waiver for open hole logs using offsetting well Wing 4-33 1H for formation tops, with GR-CBL from TD to ground level ๐ Request for Consideration/Waiver Sundry Form Non-standard logging approach relying on adjacent well data, potentially reducing costs and time for this well |
2026-02-06 | Regulatory / Permitting |
| Tier 3 |
Suspension of Drilling Operations (SOD) extension requested due to schedule changes prioritizing Drovdal 5 and Corvette/Trans Am pads, anticipating drilling out in May 2026โฐ TIME-SENSITIVE ๐ SOD Extension Sundry Form Extended suspension beyond initial plans, highlighting operational delays and reprioritization |
2026-02-02 | General Oilfield Services |
| Tier 3 |
Filter Sock Container Waiver for drilling phase, as operator does not use filter media ๐ Filter Sock Container Waiver Sundry Form Exemption from waste container requirements, indicating specific drilling practices |
2025-08-04 | Regulatory / Permitting |