| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Waiver for tubing/packer requirement, with assurances on casing integrity and monitoring during completion ๐ Tubing/Packer Waiver Sundry Form Deviation from standard safety requirements for completion design |
2025-08-04 | Regulatory / Permitting |
| Tier 3 |
Waiver for open hole logs, citing offsetting well Wing 4-33 1H for formation tops, with GR-CBL planned from TD to ground level ๐ Request for Consideration/Waiver Sundry Form Non-standard logging approach relying on adjacent well data, potentially reducing costs and time |
2026-02-05 | Regulatory / Permitting |
| Tier 3 |
Extension of Suspension of Drilling (SOD) due to schedule changes prioritizing other pads, anticipating drilling out in May 2026โฐ TIME-SENSITIVE ๐ SOD Extension Sundry Form Delays drilling to align with operational priorities, extending suspension beyond initial plans |
2026-01-21 | Drilling Rigs |
| Tier 3 |
Suspension of drilling for up to 90 days using smaller rig, with intent to return with larger rigโฐ TIME-SENSITIVE ๐ Suspension of Drilling Sundry Form Phased drilling approach to reduce costs, with strict timelines and plug-and-abandon contingencies |
2025-08-01 | Drilling Rigs |
| Tier 3 |
Waiver for filter sock container, as operator does not use filter media ๐ Filter Sock Container Waiver Sundry Form Exemption from standard waste management requirements due to operational practices |
2025-08-01 | Regulatory / Permitting |