๐Ÿ›ข๏ธ OAKLAND 154-89-32-21H-1

HUNT OIL COMPANY ยท Mountrail County, ND ยท File #42194 ยท Generated 2026-08-22 00:41

API
3306105565
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Operator requested and received a waiver to run tubing and a packer, intending to flow well up 7" casing post-frac. Justification includes casing specs, safety factors, and flowback monitoring plans.
๐Ÿ“„ Tubing/Packer Waiver Sundry (FORM ID: 325233)
Non-standard completion design omits tubing and packer initially. Indicates a specific flowback and early production strategy relying on casing integrity, with implications for well control, monitoring, and subsequent workover.
2026-07-20 Completions / Frac
Tier 2 Operator requested and received Suspension of Drilling (SOD) for up to 90 days to use a smaller rig for surface hole only, with a planned transition to a larger rig (NABORS B21) by 12/25/2025.โฐ TIME-SENSITIVE
๐Ÿ“„ Suspension of Drilling Sundry (FORM ID: 278345)
Reveals a staged drilling strategy to save cost and time. Creates a specific window for small rig services (surface drilling, casing, cementing) followed by a defined opportunity for a large rig (NABORS B21) to move on location by late December 2025.
2025-11-03 Directional Drilling
Tier 3 Stipulation: 'The north setback is based on a production liner cemented in the lateral with a fully cemented shoe and no ability to frac out the shoe.'
๐Ÿ“„ Permit Modification Stipulations (Page 2 of 10)
Explicit regulatory condition dictating a specific cementing design for the production liner shoe, removing a common contingency (fracing out). This is a locked-in design constraint.
2025-10-30 Completions / Frac
Tier 3 Well spacing unit was changed from 1280 acres (Sections 28,33) to 3840 acres (Sections 20,21,28,29,32,33) via permit modification, significantly extending the lateral length and target area.
๐Ÿ“„ Permit Modification (Page 7 of 10)
Major design change indicating a more aggressive development plan with a longer lateral (~16,000 ft vs. ~10,000 ft estimated). Requires different drilling, completion, and proppant volumes.
2025-10-30 Directional Drilling
Tier 3 Multiple, repeated well name changes (OAKLAND 154-89-33-28H-1 <-> OAKLAND 154-89-32-21H-1) across multiple sundry notices, indicating administrative confusion or strategic repositioning of the well.
๐Ÿ“„ Multiple Well Name Change Sundries (FORM IDs: 275199, 310246, 326617)
Unusual frequency of name changes suggests potential issues with initial permitting, land/unit alignment, or a strategic shift in target location within the pad. Highlights administrative diligence.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling & Rig Services
Two-phase rig schedule: Small rig (T&S) for surface hole immediately, with a firm transition to large rig (NABORS B21) by late Dec 2025. Creates sequential opportunities.
Cementing
Non-routine stipulation requiring a fully cemented production liner shoe with 'no ability to frac out.' This is a high-stakes, mandatory design requirement for the upcoming completion.
Flowback & Well Testing
Tubing/packer waiver dictates an unconventional flowback up casing, requiring specialized pressure monitoring and well control services during initial production.
Civil Construction & Earthwork
Pad is shared with another well (Shell 153-89-5-16H-1). Detailed cut/fill volumes and pad design by KLJ indicate recent or imminent construction activity.