๐Ÿ›ข๏ธ CLIFFSIDE FEDERAL 5103 41-7 2B

Whiting Oil & Gas Corp. ยท McKenzie County, ND ยท File #42230 ยท Generated 2026-04-24 02:12

API
3305310681
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Geological steering using Starsteer software with a 12-foot target window within Middle Bakken facies, assisted by remote geosteering.
๐Ÿ“„ Geological Summary and Horizontal Wellbore section
Advanced software-driven steering for precise facies targeting, with remote support indicating tech adoption.
2025-12-09 General Oilfield Services
Tier 3 Waiver requested for open hole logs, justified by proximity to offset well PAULSON 13-14H within a mile, allowing GR-CBL from TD to ground level instead.
๐Ÿ“„ Sundry Form for Well File No.: 42230, FORM ID: 264940
Non-standard logging approach to reduce costs or expedite operations, relying on offset data rather than full open hole suite.
2025-08-21 Regulatory / Permitting
Tier 3 Five-well pad design with specific wellbore trajectories, including off-spacing drilling into adjacent units with surface use agreement executed.
๐Ÿ“„ Permit Information and Affidavit Affirming Surface Use Agreement
Multi-well pad with horizontal laterals extending into off-lease units, requiring regulatory approvals and landowner agreements.
2025-07-29 General Oilfield Services
Tier 3 Notification provided to adjacent operator Zavanna LLC for drill-back into their spacing unit, including wellbore diagrams and commencement dates.โฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Proactive compliance for off-spacing drilling, sharing operational timelines with competitors.
2025-07-10 General Oilfield Services
Tier 3 Anti-collision analysis conducted with separation factors as low as 0.534 for nearby wells like PAYETTE FEDERAL 10-15H, using gamma ray signatures for path verification.
๐Ÿ“„ Anti-Collision Statement and Anticollision Report
Tight proximity to offsets necessitates advanced steering and real-time surveys, with gamma ray correlation for collision avoidance.
2025-06-18 Directional Drilling
Tier 3 Tight drilling schedule: Spud to TD in 24 days, with curve completion in one day and lateral initiation shortly after.โฐ TIME-SENSITIVE
๐Ÿ“„ Well Summary and Geological Summary
Rapid execution suggests operational efficiency or pressure to meet timelines, despite future dates.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling and MWD Services
With TD reached November 27, 2025, and anti-collision concerns noted, immediate need for survey verification and potential sidetracks; tight proximity to offsets suggests ongoing demand for high-accuracy tools.
Completion and Fracturing Services
Well awaiting completion post-TD, with 25+ planned stages and wet shoe design for frac-out; urgency indicated by rapid drilling schedule, positioning for quick mobilization after casing.
Waste Disposal and Environmental Services
Closed mud system and specified licensed facilities for cuttings; with drilling complete, disposal operations imminent, favoring local vendors like Ideal Oilfield Disposal.
Geological and Logging Services
Waiver for open hole logs but GR-CBL required; post-drilling, focus on cement evaluation and any additional logging to support completion.