โ† Back to Daily Permits

๐Ÿ›ข๏ธ Cliffside Federal 5103 41-7 3B

Whiting Oil & Gas Corp. ยท McKenzie County, ND ยท File #42231 ยท Generated 2026-04-16 01:46

API
3305310682
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Lateral drilling began on December 2, 2025, using Starsteer software for 12-foot target window in Middle Bakken.
๐Ÿ“„ Geological Summary
Specific software and narrow target window indicate advanced geosteering for precise landing, deviating from standard practices.
2025-12-02 General Oilfield Services
Tier 3 Geological services initiated at Tyler formation (8,400' MD) on November 29, 2025, prior to KOP.โฐ TIME-SENSITIVE
๐Ÿ“„ Geological Summary
Early start of mud logging and geosteering services ahead of kick-off, suggesting proactive formation evaluation.
2025-11-29 Mud / Fluids
Tier 3 Waiver granted for open hole logs, citing offset well PAULSON 13-14H within 1 mile for formation tops.
๐Ÿ“„ Sundry Notice for Open Hole Log Waiver
Non-standard regulatory approval bypassing typical logging requirements, indicating operator's confidence in offset data for cost savings.
2025-08-20 Regulatory / Permitting
Tier 3 Permit approved with conditions including 500' setback from north/south boundaries and 150' from east/west in 1920-acre unit.
๐Ÿ“„ Permit Information
Asymmetric setbacks indicate regulatory constraints on wellbore placement, potentially limiting pad design.
2025-08-19 General Oilfield Services
Tier 3 Mud type switched from OBM to WBM through lateral, with average mud weight adjustments (10.7 to 9.9).
๐Ÿ“„ Well Summary
Non-routine mud system change mid-well, likely for cost or performance reasons in lateral section.
Relative Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Geological and geosteering services
Early initiation on November 29, 2025, signals immediate opportunity for contractors like Core Geologic.
Directional drilling and MWD
Active from KOP on November 30, 2025, through TD December 5, 2025, with vendors like Badger and Pason.
Mud and fluid services
Mud weight adjustments during curve and lateral phases, ongoing need for suppliers like Mountain Mud.