| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Lateral drilling began on December 2, 2025, using Starsteer software for 12-foot target window in Middle Bakken. ๐ Geological Summary Specific software and narrow target window indicate advanced geosteering for precise landing, deviating from standard practices. |
2025-12-02 | General Oilfield Services |
| Tier 3 |
Geological services initiated at Tyler formation (8,400' MD) on November 29, 2025, prior to KOP.โฐ TIME-SENSITIVE ๐ Geological Summary Early start of mud logging and geosteering services ahead of kick-off, suggesting proactive formation evaluation. |
2025-11-29 | Mud / Fluids |
| Tier 3 |
Waiver granted for open hole logs, citing offset well PAULSON 13-14H within 1 mile for formation tops. ๐ Sundry Notice for Open Hole Log Waiver Non-standard regulatory approval bypassing typical logging requirements, indicating operator's confidence in offset data for cost savings. |
2025-08-20 | Regulatory / Permitting |
| Tier 3 |
Permit approved with conditions including 500' setback from north/south boundaries and 150' from east/west in 1920-acre unit. ๐ Permit Information Asymmetric setbacks indicate regulatory constraints on wellbore placement, potentially limiting pad design. |
2025-08-19 | General Oilfield Services |
| Tier 3 |
Mud type switched from OBM to WBM through lateral, with average mud weight adjustments (10.7 to 9.9). ๐ Well Summary Non-routine mud system change mid-well, likely for cost or performance reasons in lateral section. |
Relative | Mud / Fluids |