๐Ÿ›ข๏ธ Cliffside Federal 5103 41-7 4B

Whiting Oil & Gas Corporation ยท McKenzie County, ND ยท File #42232 ยท Generated 2026-04-16 01:46

API
3305310683
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Waiver granted for open hole logs, citing offset well PAULSON 13-14H within 1 mile for formation tops establishment, with GR-CBL to be run from TD to ground level
๐Ÿ“„ Sundry Notice for Open Hole Log Waiver
Non-standard regulatory approval bypassing typical logging requirements, indicating cost-saving or efficiency measures not common in all wells
2025-08-20 Regulatory / Permitting
Tier 3 Notification to BLM for federal minerals in spacing unit, with 1920-acre unit for wells 2B-5B and 3840-acre for 6BXโฐ TIME-SENSITIVE
๐Ÿ“„ Email from Daniel J. Kuchar to Melissa Szudera
Explicit coordination with federal agencies for multi-well pad, indicating regulatory complexity in federal lands
2025-07-31 General Oilfield Services
Tier 3 Surface Use Agreement executed with landowner for Lot 4, Section 7, T151N, R103W, for off-lease drilling
๐Ÿ“„ Affidavit Affirming Surface Use Agreement
Formal agreement for surface access in off-lease scenario, enabling multi-well operations from single pad
2025-07-29 General Oilfield Services
Tier 3 Affidavit affirming drill-back notification to adjacent operator Zavanna LLC on 7/10/2025, including wellbore diagram and contact infoโฐ TIME-SENSITIVE
๐Ÿ“„ Affidavit Affirming Drill-Back Notification
Proactive compliance with NDIC Order 31973 for horizontal drilling outside spacing unit, ensuring no interference
2025-07-10 General Oilfield Services
Tier 3 Use of Starsteer software for wellbore steering in the lateral section
๐Ÿ“„ Geological Summary - Horizontal Wellbore section
Specific software choice for geosteering, not a standard mention, suggesting preference for advanced directional control tools
Relative Directional Drilling
Tier 3 Mud type switch: OBM from surface casing to end of curve, then WBM through lateral
๐Ÿ“„ Well Summary - Mud Type
Dual mud system indicating tailored drilling strategy for different hole sections, potentially for cost or performance optimization
Relative Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Geosteering and directional drilling services
With lateral drilling starting December 10, 2025, and TD December 13, 2025, immediate opportunity for real-time steering support in Middle Bakken
Mud and chemical supply
Mud switch at end of curve (December 9, 2025) signals need for WBM suppliers during lateral phase
Regulatory and permitting support
Post-permit approval (August 19, 2025) but with waivers and notifications completed, focus on execution; future pads may require similar assistance