| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 1 |
Well design includes a cemented production liner with a 'Wet Shoe Sub' at the toe, explicitly stated to have 'no ability to frac out the shoe'. A bridge plug must be set at the toe to isolate it before stimulation. ๐ Multiple locations: Stipulations section (Bakken Setback Summary), Well Construction Diagram notes, vendor diagram notes This is a specific and non-standard completion design choice. The wet shoe is for pumping perforation guns, but requires a bridge plug for isolation, adding a mandatory step to the completion sequence. |
Unknown | Completions / Frac |
| Tier 3 |
Operator requested and received approval for a 90-day suspension of drilling after spudding surface hole with a smaller rig (Noble Rig #4), with plan to return with larger rig (Noble B12) to complete well.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 42253 - DESCRIPTION (OPERATOR) section Reveals a staged drilling approach to save costs, creating a defined 90-day window for the larger rig mobilization and completion drilling. This is not a standard continuous drilling operation. |
2026-08-14 | Drilling Rigs |
| Tier 3 |
Regulator imposed specific condition: Operator must call immediately after spudding and when plug is bumped with casing/cement info, and call field inspector when conventional rig moves back on location. Monthly conventional rig updates required. ๐ Sundry Form for Well File No.: 42253 - REVIEWER COMMENTS section Non-standard, heightened regulatory oversight and reporting requirements for this specific well due to the staged drilling plan. |
2026-08-14 | Drilling Rigs |
| Tier 3 |
Permit includes a specific core and sample collection mandate from the Base of the Last Charles Salt, with strict intervals (30' vertical/curve, 200' lateral) and 30-day submission deadline post-drilling.โฐ TIME-SENSITIVE ๐ Letter 'RE: CORES AND SAMPLES' from Ross Edison, Geologist A mandated, non-waivable geologic data collection program with a firm deadline. Not all permits include such explicit, dated directives. |
2025-09-02 | Mud / Fluids |
| Tier 3 |
Operator declared cuttings disposal vendor: Buckhorn Energy Services LLC at Dishon Special Waste Landfill. ๐ PROPOSED WORK section - Disposition of Cuttings Explicit pre-selection of a waste hauling and disposal contractor in the permit, locking in that vendor relationship for this operation. |
Unknown | General Oilfield Services |