HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42289 ยท Generated 2026-08-28 04:04

API
3306105575
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Permit modification from original horizontal to U-turn lateral design
๐Ÿ“„ Page 7 of 11, PROPOSED WORK section
Significant design change from standard horizontal to U-turn lateral indicates complex boundary navigation and potential for higher-cost directional drilling services.
2026-08-27 Directional Drilling
Tier 3 Closed mud system with no cuttings pit mandated
๐Ÿ“„ Page 1 of 11, Conditions of Approval
Non-standard waste handling requirement increases need for closed-loop systems and offsite cuttings hauling.
Unknown Mud / Fluids
Tier 3 As-built directional survey and frac procedures required prior to completion due to U-turn well proximity to boundaryโฐ TIME-SENSITIVE
๐Ÿ“„ Page 2 of 11, CPF section
Extra regulatory hurdle specific to U-turn wells near boundaries; adds time and documentation burden before completion.
Relative Directional Drilling
Tier 3 Surface location shift (1868 FSL/569 FEL to 1843 FSL/551 FEL) requiring permit modification
๐Ÿ“„ Page 7 of 11, PROPOSED WORK section
Physical pad relocation after initial permit suggests pad redesign or optimization; indicates active pad layout engineering.
Relative General Oilfield Services
Tier 3 Mandatory pre-construction contact with NDIC Field Inspector Dylan Roachโฐ TIME-SENSITIVE
๐Ÿ“„ Page 1 of 11, Conditions of Approval
Regulatory condition creates a gate before any location construction can begin; inspector availability becomes critical path.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & Surveying
U-turn lateral requires specialized directional expertise; as-built survey submission is regulatory requirement before completion.
Closed-Loop Drilling Systems
Mandated 'closed mud system with no cuttings pit' creates immediate need for specialized fluid handling and cuttings hauling.
Civil Construction & Pad Modification
Surface location shift requires pad modification; final surfacing scheduled for 2026 per civil drawings.
Well Control Equipment
Specific BOP stack configuration with brand preferences indicates need for precise equipment sourcing and testing.