๐Ÿ›ข๏ธ EN-Van Berkom-157-93-2627H-3U

HESS BAKKEN INVESTMENTS II, LLC ยท Mountrail County, ND ยท File #42290 ยท Generated 2026-08-28 04:05

API
3306105576
Target Formation
Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Use of a 'wet shoe' sub in the production liner to intentionally over-displace cement by 2 bbls and allow first stage frac out the shoe.
๐Ÿ“„ Completion Equipment section and Drilling Prognosis
Non-standard cementing/completion technique designed for specific zonal isolation and frac initiation, indicating engineered completion design.
Unknown Completions / Frac
Tier 3 Well name change request from EN-Van Berkom-157-93-2627H-3 to EN-Van Berkom-157-93-2627H-3U approved via sundry.
๐Ÿ“„ Sundry Form, Description (Operator) and Additional Sundry Data sections
Indicates a post-permit modification, possibly for unitization, re-entry, or regulatory alignment, creating a distinct well identity for tracking and operations.
2026-05-05 General Oilfield Services
Tier 3 Anticollision report generated June 5, 2025, shows close approaches (Separation Factor <1.5) with multiple offset wells on the same pad.โฐ TIME-SENSITIVE
๐Ÿ“„ Anticollision Report summary and ladder plot
Recent engineering analysis confirming tight spacing with pad siblings (H-2, H-4, H-5) and an existing well (2627H-1), elevating drilling risk.
2025-06-05 Directional Drilling
Tier 3 Detailed, engineered pad and access road design by KLJ Engineering with extensive erosion control and interim reclamation specifications.
๐Ÿ“„ Well/Facilities Pad & Access Road Design sheets, Plan Notes
Extensive, prescriptive civil design exceeding typical permit notes, indicating high environmental compliance focus and pre-construction planning maturity.
2025-05-19 General Oilfield Services
Tier 3 Affidavit from Hess Senior Manager confirming Halliburton Energy Services does not use specified diesel fuels in HF operations, dated April 21, 2022.
๐Ÿ“„ Letter from Tom Richardson, Senior Manager - Drilling & Completions
A dated, signed affidavit addressing specific regulatory (EPA) compliance for hydraulic fracturing fluids, pre-emptively locking in a major service provider.
2022-04-21 Completions / Frac
Tier 3 Explicit anti-collision statement details Hess's internal standards (1.5 separation factor, MWD survey frequency, geo-steering with Gamma ray).
๐Ÿ“„ Proposed Work - Anti-Collision Statement section
Reveals operator's proprietary collision avoidance protocols beyond NDIC minimums, indicating a dense drilling environment and operational rigor.
Unknown Directional Drilling
Tier 3 Specific NDIC Field Inspector contact (Dylan Roach at 701-770-1981) mandated for pre-construction notification.
๐Ÿ“„ Conditions of Approval section
Unusual to name a specific inspector in the permit; indicates heightened regulatory oversight or site-specific concerns requiring direct coordination.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD / Geo-steering
Anti-collision report (June 2025) shows very close approaches to other wells. Drilling must commence with high-precision surveys and real-time anti-collision monitoring as per Hess's stated standards.
Civil Construction & Earthwork
Engineered pad design is complete (May 2025). Construction must follow detailed KLJ plans. Significant quantities of excavation, embankment, surfacing, and erosion control installation are required before drilling can spud.
Cementing Services
Non-standard cementing program with a wet shoe sub and specific over-displacement volume for the production liner. Requires precise execution to achieve designed zonal isolation and frac access.
Hydraulic Fracturing Services
Halliburton is pre-selected per 2022 affidavit. Completion design (wet shoe, plug-and-perf for subsequent stages) dictates specific frac fleet and pump-down capabilities. Planning should be advanced.
Environmental & Regulatory Compliance Services
Mandatory contact with specific NDIC Field Inspector prior to construction. Need for filter sock container management and adherence to detailed erosion control plans creates ongoing compliance service needs.