โ† Back to Daily Permits

๐Ÿ›ข๏ธ Charlene Ferrari 9-4 6H-LL

Phoenix Operating LLC ยท Williams County, ND ยท File #42294 ยท Generated 2026-04-07 03:14

API
33-105-06689
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 2 Request for variance to NDAC 43-02-03-21 for tubing/packer requirement, citing safety factors and monitoring assurances.
๐Ÿ“„ Sundry Form for Tubing/Packer Waiver
Indicates non-standard casing design to optimize completion, deviating from typical packer requirements for cost or operational efficiency.
2025-09-24 General Oilfield Services
Tier 3 Agitator failure in drill string during lateral drilling, requiring trip out, replacement, and resumption of operations.
๐Ÿ“„ Horizontal Wellbore section in Geological Summary
Highlights operational downtime and equipment reliability issues in high-angle drilling, potentially impacting ROP and costs.
2025-11-07 General Oilfield Services
Tier 3 Deviation in formation tops: Base of Last Salt 8' deeper than prognosis, Mission Canyon top 42' deeper.
๐Ÿ“„ Geological Summary
Shows unexpected subsurface conditions requiring real-time adjustments to landing targets, indicating geological variability.
2025-11-03 General Oilfield Services
Tier 3 Request for waiver to NDAC Section 43-02-03-19.2 for filter sock container, justified by not using filter media during drilling.
๐Ÿ“„ Sundry Form for Filter Sock Container Waiver
Demonstrates operator's intent to minimize on-site waste management requirements, potentially reducing costs and logistical overhead.
2025-09-23 Regulatory / Permitting

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional drilling and surveying services
Well spudded in late October 2025 and completed by early November, creating immediate opportunities for MWD, survey corrections, and steering software providers in the Williams County Bakken.
Mud logging and geological consulting
On-site services began November 3, 2025, at logging depth, with real-time adjustments needed due to formation deviations, signaling urgent need for experienced consultants.
Downhole tools and maintenance
Agitator failure on November 7, 2025, during lateral drilling highlights potential for tool replacement and inspection services in ongoing or upcoming wells on the pad.