๐Ÿ›ข๏ธ RELLA W 5303 13-18 2B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42344 ยท Generated 2026-08-22 00:53

API
3310506707
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Operator requested and received approval for suspension of drilling for up to 90 days to use a smaller rig for surface hole only, then move off and bring larger rig within 90 days to complete drilling.โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Sundry Type: Request for Consideration/Waiver
Reveals a staged, cost-saving drilling strategy that creates two distinct rig mobilization/demobilization events and a 90-day window for larger rig services.
2025-11-19 Drilling Rigs
Tier 2 Operator declared use of a 'wet shoe' liner configuration (400' uncemented annulus at toe) to enable pump-down wireline perforating for first stage, avoiding more expensive tubing/tractor methods.
๐Ÿ“„ Full Well Details section - Discussion of 'Standard Wet Shoe'
Explicit design choice to reduce completion cost for stage 1, indicating preference for wireline services over tubing-conveyed or tractor methods.
Unknown Completions / Frac
Tier 3 Motor failure at 25,580' MD in lateral required TOOH and ~21.5 hour downtime before resuming drilling.
๐Ÿ“„ Sample Descriptions - notation at 15 | Page
Downhole motor failure in lateral indicates equipment stress, potentially leading to additional motor runs, fishing operations, or BHA redesign.
2025-12-25 General Oilfield Services
Tier 3 Drilling plan includes a trip out of hole (TOOH) at 10,892' MD due to build rate issues during curve, with resumed building after a ~17.5 hour delay.
๐Ÿ“„ Geological Summary - Curve section
Unplanned operational disruption indicates directional drilling challenges, potentially requiring BHA changes or additional directional supervision.
2025-12-20 Directional Drilling
Tier 3 NDIC reviewer imposed condition: 'surface holes are not to be intentionally deviated' due to potential severe casing wear during vertical/curve drilling.
๐Ÿ“„ WELL SUNDRY FORM - REVIEWER COMMENTS
Regulatory restriction on surface hole deviation indicates awareness of casing wear risks, potentially influencing BHA design and directional drilling approach.
2025-11-19 Directional Drilling
Tier 3 NDIC required specific sample collection protocol: 30' intervals in vertical/build, 200' in lateral, with shipment to state core library within 30 days of drilling completion.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Ross Edison, Geologist, ND Geological Survey
Regulatory mandate with strict timeline for sample handling and shipment, not standard for all wells.
2025-09-29 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD Services
Curve section experienced build rate issues requiring TOOH and directional challenges; motor failure in lateral indicates potential need for additional directional tools and supervision.
Rig Mobilization/Demobilization & Logistics
Staged rig strategy creates two separate rig moves: small rig for surface hole (3-5 days), then larger rig within 90 days. Time-sensitive opportunity for rig transport and site preparation services.
Sample Handling & Shipping
Regulatory requirement to wash, dry, package, and ship cuttings to state library within 30 days of drilling completion creates immediate post-drilling service window.
Casing & Cementing Services
Specific centralizer program detailed (27 centralizers for 7" casing), wet shoe configuration, and regulatory prohibition on surface hole deviation all indicate focused attention on casing integrity.
Wireline Perforating
Wet shoe design specifically enables pump-down wireline for first stage, creating opportunity for wireline services during completion phase.