โ† Back to Daily Permits

๐Ÿ›ข๏ธ RELLA W 5303 13-18 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42345 ยท Generated 2026-08-22 00:54

API
3310506708
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit includes a 'wet shoe' liner configuration (intentionally uncemented annulus at toe) to enable pump-down wireline perforating for first stage, avoiding more expensive tubing-conveyed or tractor methods.
๐Ÿ“„ Full Well Details - Discussion
Reveals a specific, cost-conscious completion design choice that dictates the method for toe initiation.
Unknown Completions / Frac
Tier 3 Operator requested and received approval for a 90-day suspension of drilling after spudding surface hole with a small rig, to later bring in a larger rig for TD, citing cost and time savings.โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Suspension of Drilling
Reveals a staged drilling strategy using two different rig sizes, creating a defined 90-day window for service providers between surface casing and main drilling operations.
2025-11-19 Directional Drilling
Tier 3 NDIC issued a specific core and sample collection order requiring cuttings at 30' intervals in vertical/build and 200' in lateral, with shipment to state library within 30 days of drilling completion.โฐ TIME-SENSITIVE
๐Ÿ“„ RE: CORES AND SAMPLES letter from ND Geological Survey
Imposes a regulatory-driven, time-bound sample handling and shipping obligation not part of standard drilling.
2025-09-29 General Oilfield Services
Tier 3 NDIC stipulation requires operator to contact Field Inspector Jessica Gilkey prior to location construction and immediately upon spudding.
๐Ÿ“„ PERMIT INFORMATION - Stipulations
Adds a mandatory regulatory checkpoint before pad construction can begin, potentially affecting project start timeline.
Relative General Oilfield Services
Tier 3 Drilling program explicitly waives open hole logs; only a Cement Bond Log is planned from intermediate casing up to surface shoe.
๐Ÿ“„ EVALUATION PROGRAM
Indicates operator confidence in geological steering (supported by detailed offset data) and intent to reduce evaluation costs.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pad Construction & Earthwork
NDIC stipulation requires contact with Field Inspector Jessica Gilkey BEFORE construction begins. This is a immediate pre-construction gate.
Small Rig Drilling & Surface Casing Services
Approved plan to spud with a small rig and set surface casing within 3-5 days, with a 90-day window to bring in the main rig. This defines a near-term, short-duration opportunity.
Sample Handling & Freight Logistics
Regulatory order mandates shipment of cuttings to Grand Forks core library within 30 days of drilling completion (Jan 6, 2026). This creates a firm deadline for post-drilling sample services.
Cased-Hole Logging (CBL)
Operator has waived open-hole logs but plans a Cement Bond Log. This focuses the wireline logging opportunity solely on cased-hole evaluation post-cementing.
Solid Drill Cuttings Disposal
Permit lists seven pre-approved licensed disposal facilities. Hauling contracts will be awarded to one of these, defining a limited competitive set.