๐Ÿ›ข๏ธ RELLA W 5303 13-18 4BX

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42346 ยท Generated 2026-08-22 00:55

API
3310506709
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 2 Permit includes a 'wet shoe' liner configuration for the production liner, with intentional over-displacement creating ~400 ft of uncemented annulus at the toe.
๐Ÿ“„ Full Well Details section (Anticollision Report vicinity)
Non-standard cementing/completion design choice to facilitate cheaper wireline pump-down perforating for the first stage instead of using tubing or a tractor.
Relative Completions / Frac
Tier 3 Operator requested and received approval for a 90-day suspension of drilling after spudding surface hole with a smaller rig, to later bring in a larger rig to complete drilling.โฐ TIME-SENSITIVE
๐Ÿ“„ WELL SUNDRY FORM - Request for Consideration/Waiver - Suspension of Drilling
Reveals a staged, cost-saving drilling strategy using two different rig sizes, creating a defined 90-day window for the larger rig mobilization and service opportunity.
2025-11-19 Drilling Rigs
Tier 3 Affidavit certifying drill-back notification was sent to adjacent operator (Devon Energy) on a specific date, as required by NDIC Order No. 31848.
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Demonstrates formal, documented compliance with inter-operator coordination policy for horizontal wells crossing unit boundaries.
2025-09-03 General Oilfield Services
Tier 3 NDIC stipulation requires operator to contact Field Inspector Jessica Gilkey prior to location construction.
๐Ÿ“„ PERMIT INFORMATION - Stipulations
Specific, named inspector pre-notification requirement adds a regulatory checkpoint before pad construction can begin.
Relative General Oilfield Services
Tier 3 Drill cuttings disposal explicitly limited to a pre-approved list of licensed facilities, with commitment to use 'closest available facility'.
๐Ÿ“„ Drilling Plan - LICENSED FACILITIES FOR SOLID DRILL CUTTINGS DISPOSAL
Operator has pre-selected a closed list of disposal vendors, locking out non-listed competitors for this well's cuttings.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling Rig & Pad Services
A larger rig is contractually slated to move onto location within a 90-day window after the surface hole was spudded on 2025-11-20. This creates a near-term mobilization opportunity.
Completion & Stimulation Services
Well status is 'Awaiting Completion' as of the report date. The wet shoe design indicates wireline pump-down perforating will be used for the first stage, defining initial service needs.
Waste Hauling & Disposal
Operator is contractually bound to use a specific shortlist of licensed disposal facilities for drill cuttings, creating immediate opportunity for those named vendors.
Civil Construction & Earthwork
Permit requires contact with a specific NDIC field inspector BEFORE location construction begins, indicating imminent or pending pad build-out.