๐Ÿ›ข๏ธ RELLA E FEDERAL 5303 13-17 3B

OASIS PETROLEUM NORTH AMERICA LLC ยท Williams County, ND ยท File #42347 ยท Generated 2026-08-22 00:55

API
3310506710
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Use of 'wet shoe' liner configuration (400' uncemented annulus at toe) to enable wireline pump-down perforating for first stage, avoiding tubing/tractor.
๐Ÿ“„ Full Well Details section, 'WET SHOE' description
Non-standard cementing/completion design choice to reduce cost and complexity for toe initiation; indicates preference for wireline over coiled tubing/tractor for Stage 1.
Unknown Completions / Frac
Tier 3 Core and sample collection mandate with strict deadlines: cuttings within 30 days of drilling completion, cores within 180 days.โฐ TIME-SENSITIVE
๐Ÿ“„ RE: CORES AND SAMPLES letter
Regulatory directive with civil penalty risk ($12,500 per offense); imposes post-drilling logistics burden for sample handling and shipping.
2025-09-29 General Oilfield Services
Tier 3 Drill-back notification to adjacent operator (Devon Energy) for wellbores exiting target spacing unit, indicating potential interference management and coordination requirements.โฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT AFFIRMING DRILL-BACK NOTIFICATION
Proactive regulatory compliance for multi-well pad with lateral exits; reveals operator coordination with competitor (Devon) and potential for operational sequencing conflicts.
2025-09-03 Completions / Frac
Tier 3 Explicit anti-collision protocol with 1.2 separation safety factor in intermediate sections, real-time corrected surveys, and gamma ray signatures for existing wellbore identification.
๐Ÿ“„ ANTI-COLLISION STATEMENT
Detailed, operator-specific collision avoidance measures exceed basic regulatory requirements; indicates high-density drilling area with proximity to multiple existing wells.
Unknown Directional Drilling
Tier 3 Waiver requested for open hole logs (no open hole logs planned), relying on cement bond log and wellsite geologist discretion with prior approval.
๐Ÿ“„ EVALUATION PROGRAM section
Operator opting out of standard porosity/resistivity logging suite, reducing evaluation costs but increasing reliance on geologist and regulatory approval for changes.
Unknown Regulatory / Permitting
Tier 3 Regulatory requirement to contact NDIC Field Inspector Jessica Gilkey prior to location construction, with specific phone number provided.โฐ TIME-SENSITIVE
๐Ÿ“„ Conditions of Approval - Construction Commencement Notification
Named inspector with direct contact requirement indicates heightened regulatory oversight for pad construction; non-compliance could delay spud.
Relative General Oilfield Services
Tier 3 Specific cementing design for production casing includes 50:50 Class G cement with D035 Poz Extender and expanding agent (D053) for salt sections.
๐Ÿ“„ CEMENTING PROGRAM section
Custom cement blend tailored for salt zones (Charles, Pine Salt) indicates geotechnical challenges; use of expanding agent suggests focus on annular isolation in reactive formations.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
Anti-collision protocols require real-time corrected surveys, gamma ray correlation, and 1.2 separation factor; high precision needed due to nearby wellbores.
Cementing
Specialized cement blends for salt zones, wet shoe design with over-displacement, and strict WOC times; isolation critical for well integrity and completion efficiency.
Wireline & Perforating
Wet shoe design enables wireline pump-down for Stage 1 perforating; vendor must be capable of pump-down operations in uncemented annulus.
Sample Management & Shipping
Regulatory mandate to collect, prepare, and ship cuttings and cores within 30/180 days; time-sensitive logistics opportunity post-drilling.
Pad Construction & Earthwork
Required notification to NDIC inspector Jessica Gilkey prior to construction; pad building must align with regulatory timing and Oasis's spud schedule.