| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Approval condition based on production liner cemented in lateral with a wet shoe and ability to frac out the shoe, indicating a specific completion design to meet north setback requirements. ๐ Page 1 of 10, Conditions of Approval Non-standard cementing/completion technique (wet shoe with frac-out capability) is mandated by regulator to achieve legal setback, implying specialized engineering. |
2026-07-13 | Completions / Frac |
| Tier 3 |
Regulatory requirement to contact NDIC Field Inspector Marc Binns prior to location construction, replacing previous inspector Gunther Harms, indicating inspector reassignment and potential new field oversight dynamics. ๐ Page 1 of 10, Permit Review Policy Change in assigned field inspector between permit versions (2025 vs 2026) may alter pre-construction coordination, inspection style, or compliance focus. |
2026-07-13 | General Oilfield Services |
| Tier 3 |
Permit modification to move surface hole location from 600' FNL 2518' FWL to 400' FNL 2503' FWL in Section 22, indicating pad layout optimization or surface constraint resolution. ๐ Page 6 of 10, PROPOSED WORK section Shows active engineering redesign after initial permit, suggesting pad reconfiguration, potential earthwork changes, or resolution of surface access/ownership issues. |
2026-07-13 | General Oilfield Services |
| Tier 3 |
Anti-collision report shows Level 2 and Level 3 separation warnings with multiple offset wells on pad (e.g., Amber 2203-1BH, Amber 2203-2BH), indicating high-density drilling with close wellbore proximity. ๐ KLX Anticollision Report summary High collision risk requires precise directional drilling and real-time monitoring. Shows pad development intensity and operational complexity. |
2026-05-04 | Directional Drilling |
| Tier 3 |
Two separate open hole log waivers approved (Oct 2025 and Jun 2026) citing offset wells AMBER 2234-6BH and AMBER 2234-7BH, indicating persistent strategy to reduce logging costs using nearby well data. ๐ WELL SUNDRY FORM sections (Form IDs 274917 and 319107) Operator repeatedly secures regulatory waivers to forego open hole logs, relying on offsets. Shows consistent cost-saving approach and confidence in subsurface predictability. |
Relative | Regulatory / Permitting |
| Tier 3 |
Drilling program specifies produced Bakken salt water as drilling fluid for 6" production interval, indicating use of recycled produced water rather than fresh water or oil-based mud in lateral. ๐ Drilling Fluids Program section Non-standard fluid selection for lateral drilling. Reflects environmental/economic strategy to reuse produced water, requiring handling, treatment, and compatibility management. |
Unknown | Mud / Fluids |