| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe sub design with cemented lateral but no ability to frac out shoe, requiring bridge plug at toe ๐ Well Construction Diagram and notes Unconventional completion design: 4-1/2" liner cemented with wet shoe sub at toe for injection, but cannot frac out shoe. Requires wireline-set bridge plug (Alpha Oil Tools Model B-1 specified) before stimulation. Increases completion complexity. |
Unknown | Completions / Frac |
| Tier 3 |
Open hole log waiver approved based on offset well data, requiring only GR-CBL from TD to ground level ๐ Sundry Form for Request for Consideration/Waiver Operator secured regulatory approval to skip standard open hole logging, reducing drilling time and costs by relying on offset well (Hallingstad 27 1H) data. This indicates confidence in subsurface predictability and potential for similar waivers on nearby wells. |
2026-03-25 | Regulatory / Permitting |
| Tier 3 |
Mandatory core and sample collection with strict 30-day (cuttings) and 180-day (cores) submission deadlines after drilling completionโฐ TIME-SENSITIVE ๐ Letter from State Geologist regarding cores and samples Regulatory requirement with fixed deadlines and significant penalties ($12,500 per offense, daily violations). Cuttings must be collected from Base of Last Charles Salt at specific intervals (30' vertical, 200' horizontal). |
2025-10-13 | General Oilfield Services |
| Tier 3 |
Off-spacing well location requiring executed surface use agreement with landowner (J.G. Acres LLC) ๐ Operator Assertions and Affidavit of Off Unit Well Location Well is located outside target spacing unit (NWNW 34-154N-89W) but within 1920-acre unit. Requires specific surface agreement, indicating potential land access complexities and pre-construction negotiations. |
2025-09-30 | Drilling Rigs |
| Tier 3 |
Pre-spud notification requirement to NDIC Field Inspector Calob Were (701-822-0147) prior to location constructionโฐ TIME-SENSITIVE ๐ Permit Stipulations Mandatory direct contact with specific field inspector before construction begins. Indicates heightened regulatory oversight for this location. |
Relative | General Oilfield Services |
| Tier 3 |
Anti-collision measures include staying 200/300 ft from active vertical wellbores and fracture stimulation size reductions near active wells ๐ Proposed Work section Operator has pre-planned mitigation for nearby wellbores (including Hallingstad 27 1H and Shell 1-3-34H). This indicates complex wellbore proximity requiring modified frac designs. |
Unknown | Directional Drilling |