๐Ÿ›ข๏ธ GO-Raymond-157-97-3119H-4

HESS BAKKEN INVESTMENTS II, LLC ยท Williams County, ND ยท File #42361 ยท Generated 2026-08-28 04:06

API
3310506712
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 2 Cemented liner with a 'wet shoe' design to intentionally over-displace cement and allow fracking out the shoe, a specific completion technique.
๐Ÿ“„ Drilling Prognosis - Completion Equipment section
Specifies a non-standard liner cementing and shoe design (wet shoe with rupture pins) to enable the first frac stage to be pumped out the shoe. This is a deliberate engineering choice for well integrity and stimulation access.
Unknown Completions / Frac
Tier 3 Spud date scheduled for 5/30/2026 at 1:00 AM with Ensign 532 rig, indicating future drilling activity beyond typical permit timelines.โฐ TIME-SENSITIVE
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 42361 DESCRIPTION (OPERATOR)
Spud date is over a year in the future (2026), indicating long-term planning and scheduling of rig Ensign 532. This provides visibility into future demand for drilling services and rig availability.
2026-05-30 Drilling Rigs
Tier 3 Core and sample collection mandate from ND Geological Survey with strict deadlines (30 days for cuttings, 180 days for cores post-drilling).โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Ross Edison/Rass Elisen to Kristyn McIntosh dated 10/13/2025
Creates immediate post-drilling service requirement for sample washing, drying, boxing, and logistics to Grand Forks. A time-critical task often outsourced.
2025-10-13 General Oilfield Services
Tier 3 Waiver request for adjacent unit operator notification requirements because Hess is the operator of the adjacent unit, streamlining regulatory process.
๐Ÿ“„ Letter from John DeWitt Jr. to Todd Holweger dated 9/30/2025
Operator leverages its own ownership of the adjacent spacing unit to waive mandatory notification steps, reducing administrative burden and potential delays.
2025-09-30 Regulatory / Permitting
Tier 3 Affidavit confirms Surface Use Agreement executed with landowners Harry & Phyllis Bowen on 7/31/2025 for off-lease drilling rights, securing surface access.
๐Ÿ“„ AFFIDAVIT (Surface Use Agreement)
Explicitly documents secured surface rights for off-lease wells (GO-RAYMOND-3119H-2 & H-3, GO-PETERS-3220H-2 & H-3) from a specific landowner. This removes a key permitting risk.
2025-07-31 Drilling Rigs
Tier 3 Detailed anti-collision plan with specific separation factors (min 1.5), survey frequencies, and use of gamma ray for geo-steering around existing wellbores.
๐Ÿ“„ PROPOSED WORK - Anti-Collision Statement
Reveals a formal, engineered approach to collision avoidance in a dense drilling environment, exceeding basic regulatory minimums. Mentions specific technologies (real-time corrected surveys, gamma ray geo-steering).
Unknown Directional Drilling
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford at 701-946-8204 prior to location construction, indicating a specific regulatory checkpoint.
๐Ÿ“„ Conditions of Approval, Page 2 of 10
Mandatory pre-construction contact with a named inspector (Robert Stafford) is a specific condition, not a generic requirement. This creates a regulatory gate before any dirt work.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Civil Construction & Earthwork
Detailed engineered pad and road design (13.64 acre disturbance) is complete and permitted. Construction must commence after contacting NDIC Inspector Robert Stafford. Bulk earthwork (24,492 CY excavation/embankment), surfacing (24,975 CY scoria), and ditch construction are imminent needs.
Drilling & Directional Services
Rig (Ensign 532) is scheduled for a future spud (5/30/2026). Advanced planning with Scientific Drilling is complete. This allows for long-lead item preparation, crew scheduling, and supply chain setup for the 2026 drilling campaign.
Environmental & Logistics (Waste/Samples)
Mandatory filter sock container must be on site at spud. Cuttings will be hauled to approved facility. Strict 30/180-day deadlines for core/sample submission to the state create immediate post-drilling logistics and lab service requirements.
Completions & Stimulation
Halliburton is pre-identified as the frac supplier. The well design (cemented liner with wet shoe, plug & perf) defines the completion architecture. Service companies can align equipment (swell packers, sliding sleeves, frac plugs) and fluid systems with this design.