| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
North setback condition based on 'production liner cemented in the lateral with a wet shoe and no ability to frac out the shoe' โ a specific, non-standard completion design constraint. ๐ STIPULATIONS section, Page 2 of 10 The regulatory approval includes a condition tied to a specific completion design (cemented liner with wet shoe). This is not a generic stipulation; it directly influences the completion method and equipment. |
2025-10-01 | Completions / Frac |
| Tier 3 |
Spud date reported as 5/29/2026, which is a future date relative to permit approval and sundry filing dates (10/2025, 06/2026). Indicates planned spud or potential data entry anomaly.โฐ TIME-SENSITIVE ๐ SUNDRY FORM FOR WELL FILE NO.: 42362 DESCRIPTION (OPERATOR) section Future spud date suggests either advanced planning for a 2026 operation or a clerical error. If accurate, it reveals long-lead planning horizon. Requires verification but signals intent. |
2026-05-29 | Mud / Fluids |
| Tier 3 |
Regulatory waiver requested for anti-collision notification to adjacent unit operator because Hess operates both the subject and adjacent units. ๐ Letter from John DeWitt Jr. to Todd Holweger dated September 30, 2025 Hess is using an internal waiver provision in Order No. 31973 to streamline permitting by avoiding formal notification to itself as the adjacent unit operator. This is a regulatory efficiency tactic. |
2025-09-30 | Directional Drilling |
| Tier 3 |
Surface Use Agreement executed with landowners (Harry & Phyllis Bowen) specifically for 'off lease' (off-spacing) wells targeting units where surface is not owned. ๐ Affidavit of Jennings White dated September 9, 2025 The agreement explicitly grants right to drill 'off lease' wells (GO-RAYMOND-157-97-3119H-2 & H-3, GO-PETERS-157-97-3220H-2 & H-3) from this pad into units where Hess does not own the surface. This is a strategic surface access play. |
2025-09-09 | Drilling Rigs |
| Tier 3 |
Detailed, engineered civil construction plan for a 4-well pad with test & group facility, including stormwater retention, cement stabilization, and specific contractor directives. ๐ ENGINEERED WELL PAD DESIGN AND CIVIL LAYOUT drawings and notes (multiple pages) The pad design is exceptionally detailed (13.64 acres disturbance, 24,975 CY of scoria, cement stabilization). It includes a 'Hess Construction Manager' role with explicit authority over contractor decisions, indicating a controlled, company-managed site construction process. |
2025-07-31 | General Oilfield Services |