| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Operator requested and received waiver from open hole logging requirements, leveraging offset well data to establish formation tops. ๐ Well Sundry Form - Request for Consideration/Waiver Demonstrates proactive regulatory strategy to reduce well construction costs and time by avoiding redundant logging. |
2026-06-17 | Regulatory / Permitting |
| Tier 3 |
Operator requested significant MAIP increase from 1318 psi to 2459 psi shortly after well completion, based on Hazen-Williams friction calculations.โฐ TIME-SENSITIVE ๐ Well Sundry Form - Maximum Injection Pressure Increase Immediate post-completion pressure uprate indicates either initial design conservatism or discovered higher injectivity, enabling higher throughput. |
2026-02-20 | General Oilfield Services |
| Tier 3 |
Pressure test of high-pressure injection line (4" Flexsteel 2250 psi) performed at 2250 psi for 30 mins, exceeding permitted MAIP at the time. ๐ Well Sundry Form - Notification of Work Performed Line tested to pressure above initial permitted MAIP, indicating infrastructure built for future pressure increases. |
2026-02-04 | General Oilfield Services |
| Tier 3 |
MIT performed and passed on 2025-12-30, with next test due in 5 years (2030-12-30), establishing well integrity baseline.โฐ TIME-SENSITIVE ๐ Well Integrity Report Early MIT pass establishes operational confidence and sets a long-term compliance calendar. |
2025-12-30 | General Oilfield Services |
| Tier 3 |
Tank diking variance approved contingent on submission of as-built schematic, indicating non-standard containment design. ๐ Permit Stipulations Regulatory granted flexibility on containment sizing suggests operator negotiated based on pad-wide containment strategy. |
2025-10-08 | General Oilfield Services |