| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Surface casing depth revised from 3000' to 2400' via Sundry Notice (Request for Consideration/Waiver). ๐ SUNDRY FORM FOR WELL FILE NO.: 42386 DESCRIPTION (OPERATOR) Operator proactively changed well design after permit approval, indicating potential geohazard reassessment or cost optimization. This creates a specific, non-standard casing point for cementing and drilling services. |
2026-07-20 | Regulatory / Permitting |
| Tier 3 |
State Geologist requires sample collection 'no lower than the: Base of the Last Charles Salt' at specific intervals, with 30-day submission deadline post-drilling. ๐ RE: CORES AND SAMPLES letter Imposes a specific, non-routine sampling protocol tied to a geologic marker (Base of Last Charles Salt) with strict packaging and timing requirements. Violations carry significant fines. |
2025-10-13 | Mud / Fluids |
| Tier 3 |
Permit includes explicit prohibition: 'Eben Operating may not use MTN Poly in the surface mud program.' ๐ PERMIT INFORMATION STIPULATIONS Regulatory mandate banning a specific product (MTN Poly, a viscosifier) in the surface hole. This is a non-standard, operator-specific restriction not found in generic permits. |
2025-10-09 | Mud / Fluids |
| Tier 3 |
Forest Service Private Road Special Use Permit issued for access road, expiring 12/31/2044. ๐ U.S. DEPARTMENT OF AGRICULTURE FOREST SERVICE PRIVATE ROAD SPECIAL USE PERMIT Well access requires a long-term (19-year) Forest Service permit with specific construction/maintenance stipulations. This is a non-routine surface access complexity. |
2025-06-24 | General Oilfield Services |
| Tier 3 |
Heater-Treater vendor pre-selected: 'Manufacturer: Dragon out of Casper Wyoming'. ๐ PROPOSED WORK section Operator has already specified a niche equipment vendor (Dragon), indicating a preferred supplier relationship for production equipment. |
Unknown | General Oilfield Services |
| Tier 3 |
Drilling program states 'SPUD DATE: AFTER SEPTEMBER 16' (year inferred as 2025 from context).โฐ TIME-SENSITIVE ๐ DRILLING PROGRAM (Version: Aug 1, 2025) Operator has defined a firm start window ('AFTER SEPTEMBER 16'), indicating planned mobilization timing. This is more specific than a generic permit date. |
Relative | General Oilfield Services |
| Tier 3 |
Cuttings/fluid disposal site pre-selected: 'Rough Rider Disposal (15 miles south of Crested Butte)' and 'Produced water will go to Compass SWD.' ๐ MUD PROGRAM and PRODUCED WATER sections Operator has designated specific, named disposal facilities for both solids (Rough Rider Disposal) and liquids (Compass SWD). This locks in waste logistics. |
Unknown | General Oilfield Services |