| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Regulatory stipulation requiring closed mud system, no drilling pit, and impermeable liner due to well location on an aquifer ๐ Permit Information / Stipulations section - Aquifer stipulation Imposes non-standard environmental controls before spud; mandates specific equipment (closed mud system, impermeable liner) and requires field inspector contact prior to location construction |
2025-10-13 | Mud / Fluids |
| Tier 3 |
Waiver requested and granted for three-day waiting period prior to construction/operationsโฐ TIME-SENSITIVE ๐ Affidavit Request for Waiver to Three-Day Waiting Period Operator secured regulatory acceleration, indicating urgency to commence operations; suggests compressed timeline for pad construction |
2025-05-19 | Regulatory / Permitting |
| Tier 3 |
Drilling rig moved between multiple wells on pad (ALE 2436-1BHN, ALE 24-1 SWD, BOCK 21-1 SWD) indicating multi-well pad development ๐ Drilling Operations section - multiple 'RELEASE RIG TO' entries Shows pad-scale development with rig moves between wells; implies sustained activity and opportunity for pad services |
Relative | Drilling Rigs |
| Tier 3 |
Multiple well control incidents: lost returns at 1,200', hole seeping at 8,079', formation instability requiring LCM sweeps ๐ Drilling Operations section - detailed trouble descriptions Persistent wellbore stability challenges requiring frequent LCM treatments, mud weight increases, and specialized additives (Gilsonite, PAVPLEX, PRIMO) |
Relative | Mud / Fluids |
| Tier 3 |
Unusual drilling fluid transition from OBM (10.6-10.8 ppg) to produced Bakken salt water (9.6-9.7 ppg) in lateral section ๐ Drilling Plan - Drilling Fluids Program and Drilling Operations section showing MW reduction Non-standard fluid program using produced water instead of fresh/synthetic base; indicates operator cost optimization or water management strategy |
Relative | General Oilfield Services |