| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 | Use of Flexsteel 3000 psi line for pipeline pressure test, approximately 385 ft long⏱ URGENT Notification of Work Performed sundry |
12/03/2025 | General Oilfield Services |
| Tier 3 | Perforations run on 11/7/2025 across Inyan Kara Fm. with detailed intervals and stimulation plan COMPLETION PERFORATIONS and Stim/Frac Summary |
11/07/2025 | General Oilfield Services |
| Tier 3 | Mud logging services provided by 2 Bees Consulting LLC, with on-site geological services starting at 4750' MD Geological Summary section |
10/31/2025 | Mud / Fluids |
| Tier 3 | Geotech report indicates clay soils with hydraulic conductivity suitable for spill containment, with specific moisture conditioning requirements Geotechnical Report |
08/04/2025 | General Oilfield Services |
| Tier 3 | Use of oil-based mud in drilling from 3000' to TD, deviating from typical freshwater mud in surface hole Drilling Fluids and Cuttings Program section |
Relative | Mud / Fluids |
| Tier 3 | Injection fluid specific gravity of 1.21, with maximum rate of 30,000 BPD and pressure up to 1346 psi UIC INFORMATION and Injection Fluid sections |
Unknown | General Oilfield Services |