← Back to Daily Permits

🛢️ G Arnold 1 SWD

FIREBIRD SERVICES, LLC · Divide County, ND · File #42396 · Generated 2026-02-06 17:15

API
3302301699
Target Formation
Dakota Group
Confidence
High

📊 Signals

Tier Signal Date Service Impact
Tier 3 Use of Flexsteel 3000 psi line for pipeline pressure test, approximately 385 ft long⏱ URGENT
Notification of Work Performed sundry
12/03/2025 General Oilfield Services
Tier 3 Perforations run on 11/7/2025 across Inyan Kara Fm. with detailed intervals and stimulation plan
COMPLETION PERFORATIONS and Stim/Frac Summary
11/07/2025 General Oilfield Services
Tier 3 Mud logging services provided by 2 Bees Consulting LLC, with on-site geological services starting at 4750' MD
Geological Summary section
10/31/2025 Mud / Fluids
Tier 3 Geotech report indicates clay soils with hydraulic conductivity suitable for spill containment, with specific moisture conditioning requirements
Geotechnical Report
08/04/2025 General Oilfield Services
Tier 3 Use of oil-based mud in drilling from 3000' to TD, deviating from typical freshwater mud in surface hole
Drilling Fluids and Cuttings Program section
Relative Mud / Fluids
Tier 3 Injection fluid specific gravity of 1.21, with maximum rate of 30,000 BPD and pressure up to 1346 psi
UIC INFORMATION and Injection Fluid sections
Unknown General Oilfield Services

🎯 Operator Intent

🔧 Service Relevance

Injection pump and monitoring installation
Post-perforation and stimulation, with first injection on 12/22/2025, signaling immediate need for pump skids and SCADA systems.
Pipeline and flowline construction/testing
Pressure test completed on 12/03/2025, but full injection line from tank battery to SWD requires final hookup and testing before 12/22/2025.
Geotechnical and compaction services
Pad grading and liner placement ongoing, with geotech report dated 08/04/2025 emphasizing moisture conditioning for clay soils.