๐Ÿ›ข๏ธ C FERRARI 1 SWD

Phoenix Operating LLC ยท Williams County, ND ยท File #42402 ยท Generated 2026-08-22 01:11

API
3310506721
Target Formation
Dakota Group, Inyan Kara Fm.
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Drone survey performed for as-built pad containment volume calculation (April 27, 2026), used for regulatory submission rather than traditional survey.
๐Ÿ“„ As-Built Plat Package Notes
Adoption of advanced surveying technology for regulatory compliance, indicating preference for 3D modeling and efficiency.
2026-04-27 General Oilfield Services
Tier 3 Immediate SCADA/automated alarm system implementation with ESDV (Emergency Shut Down Valve) integration required as permit stipulation, not typical post-construction upgrade.
๐Ÿ“„ UIC Permit Stipulations (Page 2 of 10) and Sundry Form ID 308133
Regulator-mandated real-time monitoring and automated shutdown from project start, indicating high-risk or high-volume site.
2025-10-14 General Oilfield Services
Tier 3 Regulator-approved tank diking variance contingent on submission of as-built schematic, indicating negotiated flexibility on containment standards.
๐Ÿ“„ UIC Permit Stipulations (Page 3 of 10)
Regulatory accommodation for pad design, suggesting operator influence and non-standard containment approach requiring specific as-built verification.
2025-10-14 General Oilfield Services
Tier 3 Rapid sequence of MAIP (Maximum Allowable Injection Pressure) increase requests from 1362 psi โ†’ 1787 psi โ†’ 1953 psi within a two-week period (April 2026), indicating urgent operational scaling or pressure optimization.โฐ TIME-SENSITIVE
๐Ÿ“„ Multiple Sundry Forms (Form IDs: 307799, 308133, 308263)
Shows operator aggressively pushing injection capacity limits shortly after well commissioning. Reveals dynamic pressure management and potential need for higher throughput.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pressure Management & Pump Services
Operator is actively testing and increasing MAIP limits (1362โ†’1953 psi). Requires pump optimization, pressure testing, and system calibration to support higher injection rates.
SCADA/Instrumentation Maintenance
Regulator-mandated SCADA with ESDV alarms requires ongoing calibration, monitoring, and potential expansion as injection parameters change.
Containment Surveying & Certification
Tank diking variance contingent on as-built schematic submission creates immediate need for surveying and volume certification post-construction.
Pipeline Integrity Testing
High-pressure injection line (2000 psi test) and ongoing pressure increases necessitate regular integrity testing and maintenance.