๐Ÿ›ข๏ธ Nelsen State Federal 5202 13-13 4B

Oasis Petroleum North America LLC ยท McKenzie County, ND ยท File #42412 ยท Generated 2026-08-22 01:14

API
3305310715
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Regulatory violation: Cement bond log shows insufficient isolation of Dakota Group (Newcastle Formation). Top of cement at 6110' vs. formation top at 5267'. Requires continuous annulus pressure monitoring and frac string for stimulation.โฐ TIME-SENSITIVE
๐Ÿ“„ Notice of Violation letter dated 4/11/26
Regulatory compliance issue creates immediate need for pressure monitoring equipment and frac string installation before stimulation can proceed. Delays completion schedule.
2026-04-11 Completions / Frac
Tier 3 Unconventional drilling approach: Operator requested and received approval for suspension of drilling operations for up to 90 days to use smaller rig for surface hole only, then bring larger rig later.
๐Ÿ“„ Sundry Form ID 287888 (Request for Suspension of Drilling)
Two-rig strategy indicates cost optimization and operational flexibility. Smaller rig handles surface casing, then larger rig completes well. Creates phased service opportunities.
2025-12-12 Drilling Rigs
Tier 3 Off-spacing surface location with executed Surface Use Agreement for drilling from pad outside target spacing unit.
๐Ÿ“„ Affidavit affirming Surface Use Agreement dated 10/15/2025
Operator secured surface rights for multi-well pad drilling into adjacent units. Indicates coordinated pad development strategy across lease boundaries.
2025-10-15 Drilling Rigs
Tier 3 Complex anti-collision planning with 1.2 separation safety factor and real-time corrected surveys. Multiple nearby wellbores identified with close approaches.
๐Ÿ“„ Anti-collision statement and report throughout document
High-density drilling area requires sophisticated collision avoidance. Real-time survey monitoring and gamma correlation needed. Indicates technical complexity.
Relative Directional Drilling

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Pressure Monitoring & Regulatory Compliance
Violation requires continuous annulus pressure monitoring with โ‰ค300 psi gauge before stimulation can proceed.
Frac String Installation
Regulatory mandate requires frac string installation prior to hydraulic fracture stimulation due to cement isolation issue.
Directional Drilling & Survey Services
Complex anti-collision environment with multiple nearby wells demands high-precision directional control and real-time monitoring.
Completion Services
Well is 'Awaiting Completion' but regulatory issues must be resolved first, creating near-term completion planning opportunity.