| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Regulatory violation: Cement bond log shows insufficient isolation of Dakota Group (Newcastle Formation). Top of cement at 6110' vs. formation top at 5267'. Requires continuous annulus pressure monitoring and frac string for stimulation.โฐ TIME-SENSITIVE ๐ Notice of Violation letter dated 4/11/26 Regulatory compliance issue creates immediate need for pressure monitoring equipment and frac string installation before stimulation can proceed. Delays completion schedule. |
2026-04-11 | Completions / Frac |
| Tier 3 |
Unconventional drilling approach: Operator requested and received approval for suspension of drilling operations for up to 90 days to use smaller rig for surface hole only, then bring larger rig later. ๐ Sundry Form ID 287888 (Request for Suspension of Drilling) Two-rig strategy indicates cost optimization and operational flexibility. Smaller rig handles surface casing, then larger rig completes well. Creates phased service opportunities. |
2025-12-12 | Drilling Rigs |
| Tier 3 |
Off-spacing surface location with executed Surface Use Agreement for drilling from pad outside target spacing unit. ๐ Affidavit affirming Surface Use Agreement dated 10/15/2025 Operator secured surface rights for multi-well pad drilling into adjacent units. Indicates coordinated pad development strategy across lease boundaries. |
2025-10-15 | Drilling Rigs |
| Tier 3 |
Complex anti-collision planning with 1.2 separation safety factor and real-time corrected surveys. Multiple nearby wellbores identified with close approaches. ๐ Anti-collision statement and report throughout document High-density drilling area requires sophisticated collision avoidance. Real-time survey monitoring and gamma correlation needed. Indicates technical complexity. |
Relative | Directional Drilling |