โ† Back to Daily Permits

๐Ÿ›ข๏ธ ECKERT 5202 13-13 6BHP

Oasis Petroleum North America LLC ยท McKenzie County, ND ยท File #42414 ยท Generated 2026-08-22 01:16

API
3305310717
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Operator requested and received 90-day suspension of drilling after spudding surface hole with smaller rig, to be followed by larger rig for TD.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form - Request for Consideration/Waiver Suspension of Drilling
Non-standard phased drilling approach to save cost/time. Surface hole drilled with freshwater mud, no saltwater, casing set and sealed, with commitment to plug if not drilled by larger rig within 90 days.
2025-12-23 Mud / Fluids
Tier 3 Drilling assembly trip due to hard streak damaging bit at ~28,849' MD, leading to tripping out of hole.
๐Ÿ“„ Geological Summary - Horizontal Wellbore
Indicates formation heterogeneity and drilling challenges in lateral, requiring unplanned trip.
2026-03-31 General Oilfield Services
Tier 3 Regulatory condition: As-built directional survey, production liner/cement details, and fracture stimulation procedures required for prior approval due to U-turn well with portions <500' from spacing unit boundary.
๐Ÿ“„ Permit Conditions of Approval
Non-routine regulatory hurdle specific to U-turn geometry and proximity to boundaries. Requires pre-completion submission and approval.
2025-12-19 Directional Drilling
Tier 3 Permit modified from 2-mile straight lateral to 4-mile 'U-Turn' (Hair Pin) well, extending TD from 22,484' MD to 33,532' MD.
๐Ÿ“„ Permit modification section, PROPOSED WORK
Major design change indicating extended lateral length and complex wellbore geometry (U-turn), impacting drilling, completion, and anti-collision planning.
2025-12-19 Directional Drilling
Tier 3 Well name changed from ECKERT 5202 13-13 6B to ECKERT 5202 13-13 6BHP.
๐Ÿ“„ Sundry Form - Well Name Change
Name change likely reflects design evolution (e.g., to 'HP' for High Performance or extended reach) post-permit modification.
2025-11-12 General Oilfield Services
Tier 3 Confidential status noted, but all information was public prior to confidentiality issuance.
๐Ÿ“„ First page header
Well file was confidential at some point, suggesting strategic value or competitive sensitivity, though current data is from public period.
Unknown General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
U-turn well with extended lateral requires precise navigation and anti-collision management, especially given proximity to boundaries and existing wellbores.
Cementing and Liner Services
Extended production liner (to ~33,532' MD) and regulatory requirement for cement details demand specialized services for long-reach well integrity.
Fracture Stimulation Design
Regulatory pre-approval needed for frac procedures due to U-turn geometry; operator must design and submit plans before completion.
Drilling Rig Mobilization
Phased drilling approach creates a 90-day window for larger rig move after surface hole; timing is critical.
Surveying and Anti-Collision
As-built directional survey required for regulatory approval; anti-collision is critical given dense offset well environment.