โ† Back to Daily Permits

๐Ÿ›ข๏ธ Hassel 5700 43-24 2BHP

Oasis Petroleum North America LLC ยท Williams County, ND ยท File #42424 ยท Generated 2026-08-22 01:17

API
3310506728
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 2 Operator filed for and was approved for Suspension of Drilling (SOD) for up to 90 days to use a smaller rig for surface hole only, then move off and bring larger rig within 90 days.โฐ TIME-SENSITIVE
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 42424 FORM ID: 287879
Indicates a specific operational plan to reduce costs and manage rig scheduling. It reveals staged drilling with a clear 90-day window for larger rig mobilization, creating a predictable follow-on service opportunity.
2025-12-12 Drilling Rigs
Tier 3 Permit includes a specific 'hair pin' azimuth turn planned at the southern extremity of the lateral, with a well crossing at the apex of the curve.
๐Ÿ“„ Geological Summary, Page 4
Complex directional drilling plan with a tight turn and an intersection with another wellbore. Requires precise navigation and increased anti-collision vigilance.
2026-03-13 Directional Drilling
Tier 3 Waiver granted for open hole logs based on offset well data, requiring only a GR-CBL from TD to surface.
๐Ÿ“„ SUNDRY FORM FOR WELL FILE NO.: 42424 FORM ID: 279222
Avoids routine open-hole logging suite, reducing service scope and cost for the operator. Shifts focus to cement bond evaluation.
2025-10-28 Regulatory / Permitting
Tier 3 Regulatory condition mandates running a CBL on the 9-5/8" Dakota string prior to running 7" casing.
๐Ÿ“„ PERMIT INFORMATION - Page 3 of 11, Conditions of Approval
A specific, non-standard regulatory stipulation tied to this permit. It mandates an additional logging operation at an intermediate casing point, not just at final casing.
2025-10-23 General Oilfield Services
Tier 3 The permit stipulates the well must be fractured 'out the shoe' of the production liner, indicating a specific completion technique.
๐Ÿ“„ PERMIT INFORMATION - Page 2 of 11, Bakken Setback Summary Statement
Reveals intent to perform an aggressive completion that fractures through the liner shoe, a specific operational technique with associated risks and equipment requirements.
2025-10-23 Completions / Frac
Tier 3 Operator is drilling from a surface location outside the target spacing unit (SWSE 24) with wellbore entering spacing unit in Sec 25, requiring a Surface Use Agreement affidavit.
๐Ÿ“„ AFFIDAVIT AFFIRMING SURFACE USE AGREEMENT
Demonstrates advanced surface land strategy and pad optimization, drilling 'off-lease' from a multi-well pad. Shows operator's willingness to execute complex surface agreements to optimize subsurface development.
2025-10-15 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling / MWD
Complex 'hair pin' turn and well crossing at curve apex demands high-precision steering. Anti-collision monitoring is critical. The planned turn creates a specific, technically challenging service window during lateral drilling.
Cement Bond Logging (CBL)
Regulatory mandate for a CBL on the 9-5/8" string creates a guaranteed intermediate logging event. A second CBL is standard on the production string, but this is an additional, required service.
Rig & Rig-Site Services
Two-phase rig plan: a smaller rig for surface hole (imminent post-permit), then a larger rig within 90 days. Creates two distinct mobilization/demobilization and site service opportunities.
Completion / Pressure Pumping
Well is 'Awaiting Completion' post-drilling. Specific plan to 'frac out the shoe' dictates a more aggressive stimulation design and equipment readiness for high-pressure work at the liner shoe.
Waste Handling / Filter Sock Disposal
Regulatory reminder letter included in file underscores requirement for leak-proof container on site from spud through flowback. Indicates ongoing compliance focus and a needed service for container supply/management.