| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Wet shoe liner design with 100' uncemented annulus at toe, requiring frac plug isolation for Stage 1. π WET SHOE SCHEMATIC and Discussion Unconventional completion design increases operational complexity and requires precise plug-and-perf execution to avoid fracturing out the shoe. |
Unknown | Completions / Frac |
| Tier 3 |
Mandatory closed mud system, no drilling pit, impermeable liner on entire location, and specific casing/cementing requirements for rat/mouse holes due to Tioga Extra-Territorial Jurisdiction. π STIPULATIONS section Stringent municipal-level environmental controls exceed standard NDIC requirements, imposing additional cost and operational constraints. |
2026-06-18 | Mud / Fluids |
| Tier 3 |
Mandatory CBL on 9-5/8" intermediate casing prior to setting 7" casing, plus standard CBL on 7" casing. π STIPULATIONS section Extra cement bond log requirement indicates regulatory concern about Dakota water string integrity, adding time and cost. |
2026-06-18 | General Oilfield Services |
| Tier 3 |
Permit modification to change surface hole to 17.5", surface casing to 13.375", and add a Dakota string (12.25" hole). π PROPOSED WORK section Non-standard casing design indicates specific geomechanical or regulatory challenges requiring larger surface hole and additional intermediate string. |
2026-06-18 | General Oilfield Services |
| Tier 3 |
Gas marketing affidavit states target first production ~7/1/2026 with combined peak gas rate of 4,600 Mcf/d, and discussions with Chord Energy and Hess for gas takeaway.β° TIME-SENSITIVE π AFFIDAVIT OF INFORMATION section Explicit gas marketing timeline and volume commitments signal impending mid-2026 completion activity and need for gas infrastructure. |
2025-10-24 | General Oilfield Services |
| Tier 3 |
Drillback waiver affidavit confirms operator is drilling six wells from same pad into adjacent spacing units, with trajectories entering Bakken outside target unit. π DRILLBACK WAIVER section Multi-well pad with extended laterals crossing unit boundaries requires regulatory waiver and demonstrates aggressive development strategy. |
2025-10-23 | Completions / Frac |
| Tier 3 |
Waiver requested for open hole logs; only cased hole logging planned unless otherwise required. π ELECTRIC LOGGING PROGRAM section Operator is avoiding standard open hole logging, relying on mud logging and cased hole evaluation, which reduces data collection but saves cost/time. |
Unknown | Mud / Fluids |
| Tier 3 |
Designated as a TIGHT HOLE with restricted access to rig floor, mudlogging unit, and data areas; communication coordinated from Houston office. π SECURITY & COMMUNICATIONS section Unusual secrecy measures limit onsite access and data flow, suggesting competitive sensitivity or proprietary drilling/completion techniques. |
Unknown | Mud / Fluids |