๐Ÿ›ข๏ธ AB-Ivy Jolyn Federal 29-26H MB

MUREX PETROLEUM CORPORATION ยท Williams County, ND ยท File #42454 ยท Generated 2026-08-26 06:28

API
3310506737
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (9)

Tier Signal Date Service Impact
Tier 2 Wet shoe liner design with 100' uncemented annulus at toe, requiring wireline plug & perf for Stage 1 and isolation frac plug to prevent treatment pumping out the shoe.
๐Ÿ“„ Drilling Program schematic and 'WET SHOE DETAIL' section
Non-standard cemented liner completion with deliberate uncemented section; increases complexity of completion operations and requires precise plug placement.
Unknown Completions / Frac
Tier 3 Mandatory closed mud system, no drilling pit, impermeable liner on entire location, and specific rat/mouse hole casing requirements due to location within Tioga's Extra-Territorial Jurisdiction.
๐Ÿ“„ Page 2 of 10, stipulations from NDIC Field Inspector
Enhanced environmental and containment stipulations beyond standard NDIC rules, driven by municipal jurisdiction.
2026-06-17 Mud / Fluids
Tier 3 CBL required on 9-5/8" intermediate (Dakota water string) prior to setting 7" casing, plus standard CBL on 7" casing.
๐Ÿ“„ Page 2 of 10, stipulations
Extra cement bond log requirement on intermediate string indicates regulatory concern about Dakota aquifer isolation.
2026-06-17 General Oilfield Services
Tier 3 Permit modification to change surface hole to 17.5", surface casing to 13.375", and add a Dakota string (12.25" hole) after initial permit approval.
๐Ÿ“„ Page 7 of 10, 'PROPOSED WORK' section
Indicates a late-stage design change, possibly due to subsurface challenges or pad optimization, requiring revised engineering and vendor coordination.
2026-06-17 Directional Drilling
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford (701-946-8204) prior to location construction and for onsite inspection with additional site-specific stipulations.
๐Ÿ“„ Page 2 of 10, stipulations
Pre-construction regulatory engagement is mandated; inspector may impose additional real-time requirements.
2026-06-17 General Oilfield Services
Tier 3 Affidavit indicates gas marketing discussions with Chord Energy and Hess, targeting first production ~7/1/2026, combined peak rate 4,600 Mcf/d.โฐ TIME-SENSITIVE
๐Ÿ“„ AFFIDAVIT OF INFORMATION by Ty Jackson
Reveals midstream negotiations and planned production timing, indicating infrastructure planning is in progress but not finalized.
2025-10-24 General Oilfield Services
Tier 3 Drillback waiver filed because MPC is operator of adjacent spacing unit; six wells on pad will enter Bakken outside target unit.
๐Ÿ“„ DRILLBACK WAIVER document
Multi-well pad design involves crossing spacing unit boundaries, requiring regulatory coordination but waived due to common operator.
2025-10-23 Directional Drilling
Tier 3 Tight hole designation: only MPC personnel, contract personnel, and designated partner representatives allowed on rig floor, mudlogging unit, or data areas.
๐Ÿ“„ Drilling Program 'SECURITY & COMMUNICATIONS'
Unusual data security restriction for a non-exploratory well; suggests competitive sensitivity around drilling parameters or formation evaluation.
Unknown Mud / Fluids
Tier 3 Waiver applied for open hole logs; drilling program states 'No OH Logs' and 'Waiver: Must be requested via a separate sundry.'
๐Ÿ“„ Drilling Program 'ELECTRIC LOGGING PROGRAM' and Page 4 of 10 'PROPOSED LOGS'
Operator intends to forgo standard open hole logging, relying on mud logging and possibly cased hole evaluation.
Unknown Mud / Fluids

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Directional Drilling & MWD
Complex well trajectory crossing spacing units with precise anti-collision requirements; wet shoe design adds completion complexity.
Cementing & Casing Services
Modified casing program with added Dakota string; multiple CBL runs required; wet shoe liner cementing requires precise displacement.
Containment & Environmental Services
Mandatory closed mud system, impermeable liner, and enhanced diking due to ETJ; specialized waste handling to Prairie Disposal.
Wireline & Completion Services
Wet shoe design requires wireline plug & perf for Stage 1 and isolation frac plug; potential for remedial work if CBL fails.
Midstream & Gas Gathering
Gas marketing discussions with Chord and Hess indicate need for timely connection; peak rate 4,600 Mcf/d requires infrastructure planning.