| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Well is subject to a 'wet shoe' liner completion design with specific frac isolation procedures for Stage 1. ๐ WET SHOE SCHEMATIC and Discussion Non-standard completion technique requiring precise cement over-displacement and wireline plug setting to isolate the uncemented annulus at the toe. Indicates a deliberate choice to enable wireline operations but adds complexity and risk. |
Unknown | Completions / Frac |
| Tier 3 |
Location is within Tioga's Extra-Territorial Jurisdiction, triggering extensive site-specific stipulations (closed mud system, impermeable liner, fence, berm, cased rat/mouse holes, etc.). ๐ STIPULATIONS section (Municipality) Urban-adjacent drilling imposes non-routine environmental and safety controls, increasing cost and complexity. Requires pre-spud inspection by NDIC Field Inspector Robert Stafford. |
2026-06-15 | Mud / Fluids |
| Tier 3 |
Permit modification to change surface hole to 17.5", surface casing to 13-3/8", and add a Dakota string (12.25" hole) after initial permit approval. ๐ PROPOSED WORK section Indicates a late-stage design change, suggesting operational learning, unexpected subsurface conditions, or equipment availability issues. This creates a window for casing and cementing vendors. |
2026-06-15 | General Oilfield Services |
| Tier 3 |
Affidavit discloses gas marketing discussions with Chord Energy and Hess, targeting first production ~7/1/2026 and combined peak gas rate of 4,600 Mcf/d.โฐ TIME-SENSITIVE ๐ AFFIDAVIT OF INFORMATION Rare explicit disclosure of midstream negotiations, projected timing, and volume commitments ahead of drilling. Shows operator's confidence in productivity and need for gas takeaway planning. |
2025-10-24 | General Oilfield Services |
| Tier 3 |
Drillback waiver filed because Murex is the operator of the adjacent spacing unit its wellbore will traverse. ๐ DRILLBACK WAIVER Reveals a multi-well pad strategy where wellbores cross into adjacent units all operated by Murex, simplifying regulatory compliance and indicating consolidated acreage control. |
2025-10-23 | Regulatory / Permitting |
| Tier 3 |
Explicit anti-collision warning with 'No-Go Zone - Stop Drilling' for offset wells Leann Rae 28-33H and Vanessa Abigail 33-28H.โฐ TIME-SENSITIVE ๐ Anticollision Report Summary High-risk proximity to existing wellbores requires real-time monitoring and possible trajectory adjustments during drilling. This is a critical operational constraint. |
2025-10-20 | Directional Drilling |
| Tier 3 |
Waiver applied for open hole logs; drilling designated as a 'TIGHT HOLE' with restricted data access. ๐ ELECTRIC LOGGING PROGRAM and SECURITY & COMMUNICATIONS Operator intends to limit geologic data collection and control information dissemination, suggesting competitive sensitivity or reliance on offset data. |
Unknown | Regulatory / Permitting |