๐Ÿ›ข๏ธ Liberty 79-2431H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #42467 ยท Generated 2026-11-20 04:31

API
3306105604
Target Formation
Three Forks First Bench
Confidence
High

๐Ÿ“Š Signals (4)

Tier Signal Date Service Impact
Tier 3 Operator requested and received approval to add a pad moat for water management prior to spud.
๐Ÿ“„ Sundry Form (Supplemental Information)
Pre-spud modification for snowmelt/precipitation shows proactive water handling and pad construction adaptation.
2026-01-09 General Oilfield Services
Tier 3 Open hole log waiver granted based on offset well data, reducing evaluation scope.
๐Ÿ“„ Sundry Form (Request for Consideration/Waiver)
Regulatory approval to skip open hole logs indicates reliance on existing data and may signal a standardized, cost-saving approach for this area.
2025-11-19 Regulatory / Permitting
Tier 3 Mandatory core and sample collection order issued by State Geologist with specific intervals and deadlines.โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from ND Geological Survey
A formal, detailed directive for sample collection creates a non-discretionary service requirement with strict 30/180-day deadlines post-drilling.
2025-11-17 General Oilfield Services
Tier 3 Permit includes condition to 'frac out the toe' via a wet shoe, indicating a specific completion technique.
๐Ÿ“„ Permit Stipulations / Drilling Plan
The approved plan explicitly includes fracturing out of the production liner shoe, a deliberate design choice for the lateral.
2025-11-10 Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Sample/Core Handling & Shipping
Mandatory order with 30-day deadline post-drilling completion creates an urgent, penalty-backed service requirement.
Cementing Services
Halliburton is named for surface casing cement; intermediate and production liner cementing programs are also detailed, indicating ongoing need.
Pad Civil Construction & Water Management
Approved moat addition and detailed KLJ earthwork plans indicate active pad modification and construction oversight.
Fracturing/Stimulation
Explicit plan to 'frac out the toe' indicates stimulation services will be required for the completion phase.