โ† Back to Daily Permits

๐Ÿ›ข๏ธ Liberty 80-2431H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #42468 ยท Generated 2026-11-20 04:33

API
3306105605
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Well was spud with rig H & P 259.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form (FORM ID: 294106) DESCRIPTION
Spud date is in the future (2026), confirming the well's operational timeline.
2026-01-24 Drilling Rigs
Tier 3 Operator requested and received approval to add a moat to the well pad for water management.โฐ TIME-SENSITIVE
๐Ÿ“„ Sundry Form (FORM ID: 292056) DESCRIPTION
Pad modification approved in winter, suggesting urgency for spring melt or immediate precipitation handling.
2026-01-09 General Oilfield Services
Tier 3 Operator changed target formation from Three Forks to Middle Bakken after permit issuance.
๐Ÿ“„ Sundry Form (FORM ID: 287078) DESCRIPTION
Target change approved post-permit, indicating adaptive development strategy based on offset results.
2025-12-09 General Oilfield Services
Tier 3 Operator successfully waived the requirement for open hole logs, relying on offset well data.
๐Ÿ“„ Sundry Form (FORM ID: 283394) DESCRIPTION
Regulatory waiver granted, eliminating a standard data acquisition step.
2025-11-18 Drilling Rigs
Tier 3 Permit requires operator to contact NDIC Field Inspector Calob Were prior to location construction.
๐Ÿ“„ Permit Stipulations Page 2
Creates a defined regulatory touchpoint and potential delay if not followed.
2025-11-10 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Earthwork & Civil Construction
Approval to add a moat was granted 2026-01-09, indicating need for immediate or near-term construction to modify pad for water containment.
Cementing
Detailed cementing program with specific Halliburton/SBM products specified for surface, intermediate, and production liner. Operations follow spud date of 2026-01-24.
Directional Drilling & MWD
Well spudded 2026-01-24. Plan specifies survey tools (Superior MWD+IFR1+SAG+F, OWSG MWD) and directional drilling through curve and lateral.
Cased Hole Logging
Open hole logs waived, but CBL/GR and MWD/GR logs are planned from KOP to TD. Service required after intermediate casing is set.
Completions & Stimulation
Operator requested permission to 'frac out the toe'. A 77-stage completion is proposed, with planning ongoing post-drilling.