โ† Back to Daily Permits

๐Ÿ›ข๏ธ Liberty 81-2431H

EOG RESOURCES, INC. ยท Mountrail County, ND ยท File #42469 ยท Generated 2026-03-21 08:54

API
3306105606
Target Formation
Three Forks First Bench
Confidence
High

๐Ÿ“Š Signals (5)

Tier Signal Date Service Impact
Tier 3 Notification of spud date with rig H & P 259 setting surface casing.
๐Ÿ“„ Notification of Work Performed section
Early spud timing post-permit, indicating urgency or alignment with seasonal drilling windows.
2026-01-23 Drilling Rigs
Tier 3 Request to add a moat to the Liberty 24 SWNW well pad to accommodate snow melt or heavy precipitation, with pad designed 2.0' higher than well pad.
๐Ÿ“„ Supplemental Information section
Custom pad modification for environmental adaptation in harsh winter conditions, beyond standard pad design.
2026-01-09 General Oilfield Services
Tier 3 Request for waiver on open hole logs, citing offsetting well Liberty 9-23 (NDIC File #18971) for formation tops, with GR-CBL planned from TD to ground level.
๐Ÿ“„ Open Hole Log Waiver section
Non-standard logging approach to reduce costs or expedite operations by relying on nearby well data instead of full open hole suite.
2025-11-19 Regulatory / Permitting
Tier 3 Affidavit affirming no diesel fuel use in hydraulic fracturing fluids.
๐Ÿ“„ AFFIDAVIT IN RE HYDRAULIC FRACTURE FLUIDS section
Explicit commitment to non-diesel fluids, aligning with regulatory preferences and environmental standards.
2025-10-22 Completions / Frac
Tier 3 Request to frac out the toe of the production liner with a wet shoe.
๐Ÿ“„ 4 1/2" Production Liner & Cementing section
Non-traditional completion design allowing frac initiation at TD without plug, potentially optimizing stimulation.
Unknown Completions / Frac

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Drilling rigs and surface casing services
Rig H & P 259 mobilized for spud on 2026-01-23, indicating immediate opportunity for rig support and casing contractors.
Cementing services
Halliburton specified for cement programs, with operations starting post-spud, creating timely demand for cementing teams.
Surveying and engineering
KLJ Engineering and surveyors involved in recent plats (dated 2025-10-20 and 2025-09-18), signaling ongoing need for precise layout services.