๐Ÿ›ข๏ธ Hoiby 158-94-4C-3-3H

PETRO-HUNT, L.L.C. ยท Mountrail County, ND ยท File #42471 ยท Generated 2026-08-22 01:19

API
3306105607
Target Formation
Middle Bakken
Confidence
High

๐Ÿ“Š Signals (7)

Tier Signal Date Service Impact
Tier 3 Mandatory core and sample collection required by State Geologist, with strict intervals and shipping deadlines (30 days for cuttings, 180 days for cores).โฐ TIME-SENSITIVE
๐Ÿ“„ Letter from Ross Edison, Geologist, dated 11/17/2025
Regulatory mandate with specific collection protocols and tight deadlines post-drilling. Non-compliance carries civil penalties up to $12,500 per day.
2025-11-17 General Oilfield Services
Tier 3 Open hole log waiver approved based on offset well data, with GR-CBL to be run from TD to ground level instead.
๐Ÿ“„ Sundry Form for Request for Consideration/Waiver (Open Hole Log Waiver)
Operator is avoiding full open hole logging suite, reducing logging costs and time, relying on offset well #19039 within a mile. Indicates a data-driven efficiency play.
2025-11-12 Regulatory / Permitting
Tier 3 Spud notification required within 3 business days via Sundry Notice, including drilling contractor and rig number.โฐ TIME-SENSITIVE
๐Ÿ“„ Permit Conditions of Approval (Page 2)
Creates a firm, short deadline for reporting spud details. The rig number (H&P #515) is already identified in a separate spud notification.
2025-11-12 Drilling Rigs
Tier 3 Operator must contact NDIC Field Inspector Robert Stafford (701-946-8204) prior to location construction.
๐Ÿ“„ Permit Conditions of Approval (Page 2)
Specific inspector named for pre-construction contact, indicating heightened regulatory oversight or site-specific sensitivities.
2025-11-12 General Oilfield Services
Tier 3 Permit includes a 500' setback from north/south boundaries, 150' from west, but only 50' from east boundary due to a fully cemented production liner shoe with 'no ability to frac out the shoe'.
๐Ÿ“„ Permit Conditions of Approval (Page 2)
Unusually tight 50' east setback is engineered and approved based on specific cementing design that eliminates risk of frac communication. This is a non-standard regulatory accommodation.
2025-11-12 Completions / Frac
Tier 3 Anticollision report shows a Level 1 warning with offset well JORGENSON 158-94-2B-11-1HS at 117.72 ft center-to-center and a separation factor of 0.83 at TD.
๐Ÿ“„ Anticollision Report Summary
Extremely close proximity to an existing wellbore (Level 1 warning) indicates high-risk drilling environment requiring precise directional control.
2025-11-03 Directional Drilling
Tier 3 Affidavit confirms surface location is outside designated spacing unit, requiring surface use agreement with landowners and notification to adjacent unit operator (Hess).
๐Ÿ“„ Affidavit by Michael Dewald dated 10/29/2025 and Affidavit by Derick J. Roller dated 11/22/2022
Surface access complexities: pad is on land not part of the drilling unit, necessitating separate surface leases and regulatory compliance (Order No. 31973).
2025-10-29 General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

Coring & Sample Management
Mandatory state requirement with 30-day deadline after drilling completion for cuttings and 180 days for cores. Immediate need for collection, processing, and shipping services.
Precision Directional Drilling & MWD
Level 1 anticollision risks require high-accuracy wellbore placement. Services are critical for safe drilling execution, especially near TD.
Cementing & Zonal Isolation
Critical to permit conditions (50' setback) and well integrity. Halliburton is pre-selected, but backup or specialty additive providers could be secondary opportunities.
Location Construction & Earthwork
Pad construction must be preceded by contact with specific NDIC inspector (Robert Stafford). Excavation and embankment quantities are detailed (20,849 CY cut), indicating imminent ground work.
Waste Hauling & Filter Sock Management
Permit requires closed mud system, cuttings hauled to approved facilities (IHD or PDI), and on-site leak-proof container for filter socks from spud through flowback.