| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Permit modification for horizontal well with specific setbacks and wet shoe configuration for frac out the shoe. ๐ Permit Information and Stipulations Non-standard setback requirements and wet shoe design indicate unique regulatory accommodations for wellbore placement and completion technique. |
2026-04-17 | Completions / Frac |
| Tier 2 |
Wet shoe liner configuration with intentional over-displacement for toe initiation. ๐ Wet Shoe configuration details Non-routine cementing technique to enable wireline perforating, avoiding more expensive tubing options. |
Relative | Completions / Frac |
| Tier 3 |
Request for suspension of drilling for up to 90 days to use smaller rig for surface hole.โฐ TIME-SENSITIVE ๐ Sundry Form ID: 297516 Unusual phased drilling approach to leverage cost savings from smaller equipment, not typical for full TD rigs. |
2026-02-26 | Drilling Rigs |
| Tier 3 |
Waiver granted for open hole logs, relying on offsetting well data. ๐ Sundry Form ID: 283542 Deviation from standard logging requirements, indicating confidence in nearby well data for formation tops. |
2025-11-19 | Regulatory / Permitting |
| Tier 3 |
Pad well locations shifted due to federal permitting issue with DASK habitat. ๐ Proposed Work section Internal communication failure led to permit changes, exposing operational adjustments. |
Relative | General Oilfield Services |