๐Ÿ›ข๏ธ Haefele 1 SWD

FIREBIRD SERVICES, LLC ยท Williams County, ND ยท File #42483 ยท Generated 2026-08-22 01:25

API
3310506743
Target Formation
Dakota (Inyan Kara Formation)
Confidence
High

๐Ÿ“Š Signals (6)

Tier Signal Date Service Impact
Tier 3 Operator requested and received approval to waive open hole logging requirements, citing offset well data within one mile.
๐Ÿ“„ Well Sundry Form - Open Hole Log Waiver
Avoids routine data acquisition cost and time. Demonstrates operator's reliance on existing subsurface data and confidence in regional geology, reducing well evaluation expenses.
2026-06-16 General Oilfield Services
Tier 3 Drone survey performed for as-built pad containment volume calculation (May 11, 2026) and for pre-construction topography (June 9, 2025).
๐Ÿ“„ As-Built Plat Notes & Pad Layout sheet
Use of drone technology for regulatory compliance (containment volume verification) and pre-construction planning. Represents modern, efficient surveying method adoption.
2026-05-11 General Oilfield Services
Tier 3 First injection occurred on 5/5/2026, just two days after the MIT test (3/16/2026) and before formal completion report submission (5/13/2026).
๐Ÿ“„ Well Sundry Form - Date of First Injection & Well Integrity Report
Injection commenced rapidly after mechanical integrity test, indicating operational readiness and urgency to begin disposal. Suggests pre-commissioning of surface facilities was completed ahead of schedule.
2026-05-05 General Oilfield Services
Tier 3 Operator successfully obtained a tank diking variance for the SWD facility, contingent on submission of an as-built site schematic.
๐Ÿ“„ Permit stipulations section, page 3 of 11
Indicates regulatory flexibility granted for facility design, reducing containment construction requirements. This variance is a non-standard approval that reduces capital cost and design constraints for the operator.
2025-11-18 General Oilfield Services
Tier 3 Two rapid, successive Maximum Allowable Injection Pressure (MAIP) increases requested and approved within one month (from 1494 psi to 1846 psi to 2048 psi).โฐ TIME-SENSITIVE
๐Ÿ“„ Well Sundry Forms - Maximum Injection Pressure Increase
Shows operational urgency to maximize injection capacity. The 554 psi total increase (37% from original) within weeks indicates either higher-than-expected disposal demand or pressure optimization post-commissioning.
Relative Drilling Rigs
Tier 3 Freshwater well sampling affidavit reveals one well (15810104BA) was inoperable during permit application, with commitment to sample in Spring 2026 after repair.โฐ TIME-SENSITIVE
๐Ÿ“„ Appendix C - Freshwater Wells within 1-mile
Creates a future regulatory obligation (Spring 2026) for freshwater sampling. Shows operator's proactive engagement with landowners and commitment to deferred compliance items.
Relative General Oilfield Services

๐Ÿ’ก Operator Intent

๐Ÿ”ง Service Operator Relevance

High-Pressure Pumping & Injection System Maintenance
Two MAIP increases within one month indicate system is operating at higher pressures than originally designed. Increased pressure may lead to more frequent maintenance, part replacement, or potential upgrades. Pressure testing of injection line to 2200 psi (above final MAIP) shows emphasis on system integrity.
Drone Surveying & Aerial Mapping
Operator used drone surveys for both pre-construction planning (June 2025) and as-built regulatory compliance (May 2026). This demonstrates an established workflow. Future pad expansions, containment modifications, or regulatory submissions will likely require similar services.
Environmental Sampling & Laboratory Analysis
Pending freshwater well sampling obligation for well 15810104BA in Spring 2026. Ongoing injection fluid monitoring required. Established vendor relationship (Pace/Astro-Chem) but potential for competitive bidding on future projects.
Containment Construction & Liner Installation
Tank diking variance was granted but requires specific containment design (steel wall with geomembrane liner). As-built shows complex containment system. Future SWD facilities for this operator may have similar variance opportunities and design requirements.