| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
As-built site schematic submitted via sundry shows detailed pad layout with co-located SWD and production facilities, including specific containment volumes and drone survey verification. ๐ Sundry Form (As-Built Site Schematic) Drone survey performed May 06, 2026 for precision; shows integrated facility design with shared infrastructure between Firebird Services (SWD) and Phoenix Operating (production). |
2026-06-30 | General Oilfield Services |
| Tier 3 |
Operator successfully requested a waiver for open hole logs, relying on offset well ADRIAN 27-26-25 4HF (#42278) within a mile, indicating a deliberate cost/time-saving strategy for SWD well. ๐ Sundry Form (Open Hole Log Waiver) Avoids routine logging expense and time; establishes precedent for using nearby well data for regulatory compliance on SWD wells. |
2026-06-16 | Regulatory / Permitting |
| Tier 3 |
Operator requested and received approval to increase Maximum Allowable Injection Pressure (MAIP) from 1485 psi to 2002 psi using Hazen-Williams method, indicating higher injection capacity than initially permitted. ๐ Sundry Form (Maximum Injection Pressure Increase) Substantial pressure increase (517 psi) suggests higher throughput capability or need to overcome friction; non-routine engineering justification submitted. |
2026-05-13 | General Oilfield Services |
| Tier 3 |
Well name changed from MJ 1 SWD to ADRIAN 1 SWD shortly after spud, indicating possible pad naming convention alignment or operational rebranding. ๐ Sundry Form (Well Name Change) Name change occurred after spud (Nov 2025) but before injection start (May 2026), suggesting administrative or branding adjustment. |
2026-05-05 | General Oilfield Services |
| Tier 3 |
Injection line pressure test performed on 3/4/2026 to 2250 psi (290 ft of 4in Flexsteel), exceeding permitted MAIP, indicating robust infrastructure installation. ๐ Sundry Form (Report Initial Pipeline Pressure Test) Test pressure exceeds both original (1485 psi) and revised (2002 psi) MAIP, demonstrating conservative design margin. |
2026-03-04 | Drilling Rigs |
| Tier 3 |
Initial MIT test passed on 03/03/2026 with next test due 03/03/2031 (5-year frequency), establishing baseline for long-term integrity monitoring.โฐ TIME-SENSITIVE ๐ Well Integrity Report MIT test witnessed by consultant Adam Lambert and NDIC inspector; sets 5-year monitoring cycle. |
2026-03-03 | General Oilfield Services |