| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator secured multiple regulatory waivers pre-spud: Filter Sock Container, Tubing/Packer, Drill Cutting Samples (vertical portion), and Open Hole Logs. ๐ Multiple WELL SUNDRY FORMS (Form IDs: 288458, 288483, 288455, 288454) Demonstrates proactive regulatory strategy to reduce operational burden and cost. The drill cuttings waiver relies on samples from an offset well on the same pad (#42507), indicating pad-scale planning. |
2025-12-16 | Regulatory / Permitting |
| Tier 3 |
Operator requested and received a 90-day suspension of drilling after spudding surface hole with a smaller rig, planning to return with larger rig to complete well within 90 days.โฐ TIME-SENSITIVE ๐ WELL SUNDRY FORM - Request for Consideration/Waiver - Suspension of Drilling Reveals a staged drilling approach to save costs, creating a defined window for rig and service mobilization. Indicates operator is optimizing capital by using a smaller rig for surface section. |
2026-02-02 | Drilling Rigs |
| Tier 3 |
MWD failure occurred at 8,950' MD (KOP) on March 13, 2026, requiring a trip out of hole. ๐ Sample Descriptions section (page 9) An unplanned downhole tool failure during a critical operation (at kick-off point) caused non-productive time. Highlights potential reliability issues or harsh drilling conditions. |
Relative | General Oilfield Services |
| Tier 3 |
Well is part of a five-well pad, with geological steering and sample collection coordinated across pads (e.g., cuttings waiver references offset well 42507). ๐ Geological Summary and Drill Cutting Samples Waiver Sundry Reveals a multi-well development campaign, not a single well. Operational and regulatory decisions are made at the pad level. |
Relative | Regulatory / Permitting |
| Tier 3 |
Operator notified Slawson Exploration Company, Inc. as required for wells entering adjacent spacing units, per NDIC orders. ๐ STATE OF COLORADO affidavit following email from NDIC Demonstrates compliance with inter-operator coordination rules for extended-reach laterals. Confirms wellbore traverses into units operated by others. |
2025-11 | Completions / Frac |