| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Request for suspension of drilling for up to 90 days using a small freshwater-based drilling rig to set surface casing, followed by a larger rig for completion, to achieve cost and time savings.โฐ TIME-SENSITIVE ๐ Sundry Form Description (Operator) for Suspension of Drilling Non-standard phased drilling approach deviates from typical continuous operations, indicating strategic cost optimization in a high-cost basin. |
2026-01-18 | Drilling Rigs |
| Tier 3 |
Waiver requested for open hole logs, relying on offset well (B HAGEN 42-3, NDIC# 8100) within one mile for formation tops, with GR-CBL to be run from TD to ground level. ๐ Sundry Form Description (Operator) for Open Hole Log Waiver Bypasses standard logging requirements, suggesting operator confidence in regional geology and cost-saving measures over redundant data acquisition. |
2025-12-01 | Regulatory / Permitting |
| Tier 3 |
Specified use of NaborsX24 drilling rig for the well, with detailed mud program transitioning from freshwater to oil-based to saltwater mud. ๐ Drilling Prognosis section Explicit rig selection and mud type sequencing indicate tailored operational choices for formation-specific challenges, not standard across permits. |
Relative | Mud / Fluids |
| Tier 3 |
Anti-collision plan includes real-time corrected surveys, 1.5 separation factor, and gamma ray geo-steering in the same geologic formation. ๐ Proposed Work - Anti-Collision Statement Detailed anti-collision protocols exceed basic permit requirements, reflecting heightened risk awareness in densely drilled areas. |
Unknown | Directional Drilling |