| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 |
Proposed start date for drilling operations with small rig.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 42518 - DESCRIPTION (OPERATOR) Specific future start date tied to suspension approval, not routine in permits. |
2026-01-18 | Drilling Rigs |
| Tier 3 |
Request for suspension of drilling for up to 90 days using small freshwater-based rig (NaborsX24) before larger rig, with surface casing set and plugged, no saltwater used, due to potential severe casing wear preventing deviation in surface holes.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 42518 - DESCRIPTION (OPERATOR) and REVIEWER COMMENTS Unusual phased drilling approach with small rig mobilization and specific mud restrictions not standard in basic permits, indicating cost-saving strategy and operational constraints. |
2025-12-03 | Mud / Fluids |
| Tier 3 |
Waiver for open hole logs granted based on offset well (B HAGEN 42-3, NDIC# 8100) within 1 mile, with GR-CBL planned from TD to ground level. ๐ Sundry Form for Well File No.: 42518 - DESCRIPTION (OPERATOR) and REVIEWER COMMENTS Deviation from standard logging requirements by relying on nearby offset data, reducing costs and time. |
2025-12-01 | Regulatory / Permitting |
| Tier 3 |
Anti-collision standards include 1.5 separation factor, real-time corrected surveys, gamma ray geo-steering around existing laterals, and increased survey frequency as needed. ๐ PROPOSED WORK - Anti-Collision Statement Detailed anti-collision protocols beyond basic permit requirements, emphasizing proactive risk management in dense field. |
Unknown | Directional Drilling |
| Tier 3 |
Infill wells with no civil work required. ๐ PROPOSED WORK Explicitly infill design without additional civil engineering, differing from new pad setups. |
Unknown | General Oilfield Services |