| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 |
Operator requested and received approval for suspension of drilling for up to 90 days after spudding surface hole with a small rig, intending to move off and return with a larger rig to TD within that window.โฐ TIME-SENSITIVE ๐ Sundry Form for Well File No.: 42559 (FORM ID: 296091) - Description (Operator) Reveals a staged drilling strategy to achieve cost and time savings. Creates a defined 90-day window for the larger rig mobilization and completion drilling. |
2026-02-02 | Drilling Rigs |
| Tier 2 |
Operator requested and received a variance to tubing/packer requirement (NDAC 43-02-03-21) based on casing specifications and completion design assurances. ๐ Sundry Form for Well File No.: 42559 (FORM ID: 288147) - Description (Operator) Deviates from standard completion design, indicating a customized approach based on specific wellbore and casing integrity assessments. |
2025-12-15 | General Oilfield Services |
| Tier 3 |
Operator requested and received approval for a pilot project waiver of onsite mud logging requirement, implementing an off-site sample collection SOP with rig personnel trained by Core Geologic. ๐ Sundry Form for Well File No.: 42559 (FORM ID: 329341) - Description (Operator) Indicates a shift in operational methodology to improve rig efficiency and reduce on-site personnel. This is a pilot project, suggesting potential for wider adoption across the operator's portfolio. |
2026-07-31 | Mud / Fluids |
| Tier 3 |
Operator changed well name from BILLINGSLEY 1-12-13 5H to HERCULES 1-12-13 5H, indicating a lease name change. ๐ Sundry Form for Well File No.: 42559 (FORM ID: 288690) - Description (Operator) Lease name changes can signal new agreements, acquisitions, or rebranding. It's a non-routine administrative event that precedes drilling. |
2025-12-17 | General Oilfield Services |
| Tier 3 |
Operator is coordinating with Steel Reef regarding an abandoned, unlocatable poly gas line that traverses the pad, which may be removed during construction.โฐ TIME-SENSITIVE ๐ Email chain from Tori Siemieniewski to Doug Jackson (NDIC), dated 2025-12-11 Reveals a pre-construction hazard mitigation effort with a third-party pipeline operator. Indicates potential for unexpected delays or scope changes during pad construction. |
2025-12-11 | General Oilfield Services |
| Tier 3 |
Drilling plan specifies disposal of all drill cuttings to Smoky Butte Environmental LLC at a specific address. ๐ Proposed Drilling Plan section: 'DISPOSAL OF DRILL CUTTINGS' Explicitly names a waste disposal vendor and location, locking in a significant logistics and service contract for the pad. |
Unknown | General Oilfield Services |