| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 3 | Request for waiver of open hole logs, justified by offsetting well Afseth 34-3 1H within a mile with available open logs, and plan to run GR-CBL from TD to ground level Sundry Information section |
2026-01-07 | Regulatory / Permitting |
| Tier 3 | Affidavit of notice to adjacent spacing unit operator (Phoenix Operating, LLC) providing directional plan details⏱ URGENT AFFIDAVIT OF NOTICE section |
2025-12-15 | Directional Drilling |
| Tier 3 | Affidavit affirming no diesel fuel use in hydraulic fracturing fluids for multiple Lostwood wells AFFIDAVIT IN RE HYDRAULIC FRACTURE FLUIDS section |
2025-11-07 | Completions / Frac |
| Tier 3 | Permit stipulation requiring wellbore placement within 500' drilling corridor and 150' setback from north-south boundaries in 5120-acre spacing unit STIPULATIONS section |
Unknown | General Oilfield Services |
| Tier 3 | Request to frac out the toe using a burst plug and pumping 5 bbls of fluid after wiper plug bumps Toe Assembly section |
Unknown | Completions / Frac |