| Tier | Signal | Date | Service Impact |
|---|---|---|---|
| Tier 2 | Specific setback requirements: 150' from north/south boundaries and 500' from east/west within 3840-acre spacing unit, with production liner cemented in lateral and ability to frac out wet shoe. NDIC Field Order Info and Bakken Setback Summary Statement |
Unknown | Directional Drilling |
| Tier 3 | Waiver requested from three-day waiting period post-APD approval for eight-well pad development.⏱ URGENT AFFIDAVIT- REQUEST FOR WAIVER TO THREE-DAY WAITING PERIOD |
2025-11-11 | Regulatory / Permitting |
| Tier 3 | Operator self-waives NDIC Order 31973 requirements for adjacent spacing unit disclosure, as KODA controls both units. Letter to NDIC dated November 6, 2025 |
2025-11-06 | General Oilfield Services |
| Tier 3 | Anti-collision modeling submitted for pad, based on known offset wells within vicinity. Directional Planning / Anti-Collision section |
2025-10-29 | Directional Drilling |
| Tier 3 | Well located on aquifer requiring closed mud system, impermeable liner, and onsite inspection for specific stipulations. Stipulations section and Permit Review Policy |
Unknown | Mud / Fluids |
| Tier 3 | Completion via plug and perf method with slick water and sand frac down 7" intermediate casing, no diesel compounds used. Completion Program and Hydraulic Fracturing sections |
Unknown | Completions / Frac |